background image

CONTENTS

Getting Other Informations and Publications

General Instructions

Important ................................................................ 2
Shipping Damage .................................................... 2
General

................................................................ 2

Field Installed Heater Packages (Optional) ............. 2

Installation

Location

................................................................ 9

Typical Installations ................................................. 9
Condensate Drain Trap ......................................... 14
Air Filters .............................................................. 14
Wiring – Main Power ............................................. 15
Wiring – 24V Low Voltage Control Circuit ............. 15
Transformer Taps ................................................... 15
Thermostats ........................................................... 15

Start Up and Operation

Three Phase Scroll Compressor Start Up
Information ............................................................. 17
Sequence of Operation .......................................... 17
Start Up Notes ....................................................... 17
Indoor Blower Motor .............................................. 17
Compressor Control Module .................................. 17
Adjustments ........................................................... 18

Service and Troubleshooting

Service Hints ......................................................... 19
Pressure Service Ports .......................................... 19
Refrigerant Charge ................................................ 19
Fan Blade Settings ................................................ 19
Suction and Discharge Tube Brazing .................... 20
Pressure Table ....................................................... 14
Wiring Diagrams ............................................... 15-16

Troubleshooting ECM Blower Motors ............. 23-24

Figures

Figure 1

Unit Dimensions ...................................... 8

Figure 2

Slab Mounting at Ground Level ............ 10

Figure 3

Airflow and Service Access
Clearances ............................................ 10

Figure 4

Roof Top Application .............................. 11

Figure 5

Elevated Mounting Platforms ................. 11

Figure 6

Prefabricated Rood Curb
Specifications ........................................ 12

Figure 7

Field Fabricated Curbing ....................... 13

Figure 8

Condensate Drain Trap ......................... 14

Figure 9

Low Voltage Wiring ............................... 16

Figure 10 Fan Blade Setting ................................. 19
Figure 11 Brazing Diagram ................................... 20

Tables

Table 1

Rated CFM & ESP .................................. 2

Table 2

Electrical Specifications .......................... 3

Table 2A Electrical Specifications .......................... 4
Table 2B Electrical Spedifications .......................... 5
Table 3

Option Field Installed Heater Packages . 6

Table 4

Electric Heater Table ............................... 8

Table 5

Unit Dimensions ...................................... 5

Table 6

Roof Curb Details ................................. 13

Table 7

Dimension for Figure 7 .......................... 13

Table 8

Filter Requirements & Sizes ................. 14

Table 9

Thermostat Wire Size ........................... 15

Table 10 Wall Thermostat and Subbase

Combinations ........................................ 15

Table 11

Suction Line Temperatures ................... 19

Table 12 Fan Blade Setting Dimensions .............. 19
Table 13 Indoor Blower Performance .................. 20
Table 14 Pressure Table ...................................... 21
Table 14A Pressure Table ...................................... 22

Содержание P1124A3

Страница 1: ...P1230A1 P1136A2 P1236A1 P1142A3 P1242A1 P1148A2 P1248A2 P1060A1 INSTALLATION INSTRUCTIONS Manual 2100 353D Supersedes 2100 353C File Volume II Tab 10 Date 03 19 03 Bard Manufacturing Company Bryan Ohi...

Страница 2: ...sions 8 Figure 2 Slab Mounting at Ground Level 10 Figure 3 Airflow and Service Access Clearances 10 Figure 4 Roof Top Application 11 Figure 5 Elevated Mounting Platforms 11 Figure 6 Prefabricated Rood...

Страница 3: ...and Summer Air Conditioning Duct Design for Residential ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning Co...

Страница 4: ...to the equipment While these instructions are intended as a general recommended guide they do not supersede any national and or local codes in any way Authorities having jurisdiction should be consult...

Страница 5: ...e r p m o C l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S s t l o V 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 0 6 4 8 0 2 0 3 2 s p m A d a o L d e t a R 0 9 5 8 6 3 1...

Страница 6: ...o s s e r p m o C l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S s t l o V 8 0 2 0 3 2 8 0 2 0 3 2 0 6 4 8 0 2 0 3 2 8 0 2 0 3 2 0 6 4 s p m A d a o L d e t a R 5 0 2 5 8 1 4...

Страница 7: ...l o r c S l l o r c S l l o r c S l l o r c S s t l o V 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 s p m A d a o L d e t a R 0 9 5 8 8 2 1 4 1 1 2 6 1 3 4 1 9...

Страница 8: ...0 4 2 A N S A N A N A N A N A N A N A N 5 1 A C P 3 H E 1 8 0 2 0 4 2 A N A N A N S A N A N A N S A N 9 0 B B P 3 H E 3 8 0 2 0 4 2 A A N A A N A S A A N S 5 1 B B P 3 H E 3 8 0 2 0 4 2 A N A N A A N...

Страница 9: ...2 7 2 3 8 0 6 0 3 0 6 0 6 1 1 1 1 3 2 6 2 6 4 3 5 8 6 9 7 1 9 4 0 1 5 2 0 3 0 5 0 6 0 7 0 8 0 0 1 0 1 1 0 1 0 1 8 6 4 4 3 2 0 1 0 1 8 6 9 0 B B P 3 H E 5 1 B B P 3 H E 3 8 0 2 0 4 2 3 8 0 2 0 4 2 9 5...

Страница 10: ...c n I g n i n e p O t c u D H e g r a h c s i D r i A n r u t e R A B C J K L M D E F G 3 A 4 2 1 1 P 2 A 4 2 2 1 P 2 A 0 3 1 1 P 1 A 0 3 2 1 P 2 A 6 3 1 1 P 1 A 6 3 2 1 P 4 1 4 2 6 1 3 8 4 8 1 8 3 8...

Страница 11: ...ing with the operation of the unit A minimum of twelve inch elevation is recommended while greater elevation may be required for areas of high snow accumulation Poured concrete steel framework brick c...

Страница 12: ...Manual 2100 353 Page 10 FIGURE 2 SLAB MOUNTING AT GROUND LEVEL Above 32 F Outside Temperature MIS 1184 FIGURE 3 AIRFLOW AND SERVICE ACCESS CLEARANCES MIS 1185...

Страница 13: ...Manual 2100 353 Page 11 FIGURE 5 ELEVATED MOUNTING PLATFORMS MIS 1183 FIGURE 4 ROOF TOP APPLICATION May also be required for ground level installations MIS 1176...

Страница 14: ...Manual 2100 353 Page 12 FIGURE 6 PREFABRICATED ROOF CURB SPECIFICATIONS HEAVY GAUGE GALVANIZED WITH WOOD NAILING STRIP WELDED LEAKPROOF ONCE PIECE CONSTRUCTION READY TO INSTALL MIS 1177C...

Страница 15: ...P 1 A 2 4 2 1 P 2 A 8 4 1 1 P 2 A 8 4 2 1 P 1 A 0 6 0 1 P 0 6 E H R 4 0 0 2 4 0 9 5 7 3 2 8 5 2 1 4 4 5 2 1 1 4 5 7 3 8 3 5 7 3 5 3 4 4 5 2 1 3 5 2 1 9 1 0 5 5 7 4 1 2 4 5 2 8 3 j A SEPARATE METAL FLA...

Страница 16: ...AIR FILTERS Air filters for the return air side of the system are not provided as part of these models and must be field supplied and installed as part of the final installation Prior thought should b...

Страница 17: ...th the equipment The correct size must be used for proper circuit protection and also to assure that there will be no nuisance tripping due to the momentary high starting current of the compressor WIR...

Страница 18: ...Manual 2100 353 Page 16 FIGURE 9 LOW VOLTAGE WIRING MIS 1180...

Страница 19: ...tarting the compressor and outdoor motor The G indoor motor circuit is automatically completed on any call for cooling operation or can be energized by manual fan switch on subbase for constant air ci...

Страница 20: ...rm signal is desired This terminal is powered whenever compressor is locked out due to HPC or LPC sequences as described NOTE Both high and low pressure switch controls are inherently automatic reset...

Страница 21: ...mperative to match the correct pressure table to the unit by model number REFRIGERANT CHARGE The correct system R 22 charge is shown on the unit rating plate Optimum unit performance will occur with a...

Страница 22: ...ormly around the circumference to flow braze material completely around the joint Slowly move torch into Area 3 to draw braze material into joint See Figure 11 Do not overheat joint MIS 1179 FIGURE 11...

Страница 23: ...5 2 2 1 8 0 4 2 2 8 0 6 2 4 8 8 7 2 5 8 5 9 2 6 8 5 1 3 7 8 5 3 3 8 8 1 5 3 B D g e d 5 8 B W g e d 2 7 e d i S w o L e d i S h g i H 4 8 2 1 2 6 8 3 3 2 7 8 8 4 2 8 8 9 6 2 0 9 7 8 2 1 9 5 0 3 2 9 6...

Страница 24: ...d 5 7 B W g e d 2 6 e d i S w o L e d i S h g i H 3 7 3 0 2 4 7 8 1 2 5 7 1 3 2 6 7 6 4 2 8 7 4 6 2 9 7 8 7 2 0 8 4 9 2 1 8 2 1 3 2 8 0 3 3 B D g e d 0 8 B W g e d 7 6 e d i S w o L e d i S h g i H 8...

Страница 25: ...k c e h C d e e p s M F C h g i h t a s f f u p r o s t n u H g n i f f u p e c u d e r r e t l i f r o l e n a p g n i v o m e r s e o D n o i t c i t s e r e c u d e R w o l f r i a m u m i x a m e...

Страница 26: ...w s c a i r T r o f k c e h C y a l e r N O T P M Y S E R U D E C O R P E S U A C e s i o n e v i s s e c x E e s i o n r o t o m r o t c u d t e n i b a c e s i o n r i a s i t i f i e n i m r e t e...

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Отзывы: