Bard CRVMP-5 Скачать руководство пользователя страница 7

Manual 2100-457D 

Page 

7 of 16

  8.  Connect “orange lead” with the fork terminal to 

either the “G” terminal of the low voltage strip 
(will ventilate anytime there is a call for the 
blower), or the “F” terminal (can be used as a 
junction point for on-demand ventilation with a 
capable thermostat or occupancy sensor).  

  9.  The pink, purple and black wires will pass through 

bushing on opposite side of low voltage box where 
they entered, and will run up the wire loom to the 
step-control assembly for connection installed in 
Step #10, Figure 4 following the wiring diagram 
(enclosed in Literature Assembly or on ventilator).

 10.  Locate the step control assembly packaged with the 

assembly.  This assembly will install in the upper 
left-hand corner of the control panel by aligning 
the plastic standoffs with pre-punched holes in the 
control panel.  See Figure 4.

 11.  Route the wires from the step control assembly 

down the control panel through the wire looms, 
and route them into the low voltage box through 
the bushing.  See Figure 4.  Make connections 
following the wiring diagram (enclosed in 
Literature Assembly or on ventilator).

 12.  Replace left filter support, filter and four (4) screws 

in condenser grille.

13.  Reinstall the blower access panel at top of unit and 

secure with sheet metal screws.

14.  Ventilator checkout – 

(Note: It may be more 

efficient to disconnect the thermostat from the 

low voltage terminal strip and use a set of jumper 

wires to perform these steps.)

 

  A.  Resupply power to the unit.

   B. Energize the evaporator blower by switching    

 

thermostat to the manual fan position with  

 

heat/cool in OFF position.  

(Jumper “R” to “G”)

 

  C.  Ventilator should open to the position set by  

 

“R1” potentiometer on step control board.  (See  

 

Figure 5.)

 

  D.  Now energize Stage #1 cooling/heating by    

 

switching the thermostat to the corresponding  

 

mode and setting the temperature offset slightly  

 

beyond the actual room temperature.  

(Jumper  

 

“R” to “G” and “Y1”)

 

  E.  Ventilator should now open to the position set  

 

by “R2” potentiometer on step control board.   

 

(See Figure 5.)

Содержание CRVMP-5

Страница 1: ...EL CRVMP 5 For Use with Bard 3 through 5 Ton WA S Series Wall Mount Air Conditioners INSTALLATION INSTRUCTIONS Manual 2100 457D Supersedes 2100 457C File Volume III Tab 19 Date 01 24 14 Bard Manufactu...

Страница 2: ...igures Figure 1 Removal of Exterior Panels 4 Figure 2 Remove Air Filter Exhaust Cover Plate 5 Figure 3 Install Ventilator 6 Figure 4 Step Control Installation 8 Figure 5 Damper Control Board 9 Figure...

Страница 3: ...eived and that there is no visible damage Note any shortages or damage on all copies of the freight bill The receiving party must contact the last carrier immediately preferably in writing requesting...

Страница 4: ...embly which includes the integral ventilator with attached electrical harness step control assembly and miscellaneous hardware WARNING Open and lock unit disconnect switch before installing this acces...

Страница 5: ...00 457D Page 5 of 16 FIGURE 2 REMOVE AIR FILTER AND EXHAUST COVER PLATE 3 Remove and save existing unit air filter and screws from front center grille See Figure 2 4 Remove and discard the exhaust cov...

Страница 6: ...ntilator into the unit to the far left side clearing the right filter bracket Once the ventilator is fully inserted slide the ventilator to the right until it is tight against the back of the control...

Страница 7: ...he control panel through the wire looms and route them into the low voltage box through the bushing See Figure 4 Make connections following the wiring diagram enclosed in Literature Assembly or on ven...

Страница 8: ...t damper blade for required ventilation See next section 16 Replace mist eliminator filter Be sure that it is installed with the drain holes to the bottom 17 Remove blank off plate or barometric fresh...

Страница 9: ...TENTIOMETER FOR STAGE 1 HEATING OR COOLING DAMPER POSITION G AND Y1 CONTROL SIGNALS FOR STAGE 2 HEATING OR COOLING DAMPER POSITION G Y1 AND Y2 CONTROL SIGNALS R3 ADJUSTMENT POTENTIOMETER R1 ADJUSTMENT...

Страница 10: ...See Figure 5 C Using a small screwdriver adjust potentiometer until damper position aligns with numerical location on the label interior of the sheet metal damper assembly 2 Set the damper position fo...

Страница 11: ...Ventilation Airflow CFM Vent Position WA3S Ventilation Airflow Stage 2 Operation Blower Only Stage 1 Operation 0 100 200 300 400 500 600 700 800 900 1000 0 2 5 5 7 5 10 12 5 15 17 5 20 22 5 25 27 5 30...

Страница 12: ...Page 12 of 16 0 100 200 300 400 500 600 700 800 900 1000 0 2 5 5 7 5 10 12 5 15 17 5 20 22 5 25 27 5 30 Ventilation Airflow CFM Vent Position WA5S Ventilation Airflow Stage 2 Operation Stage 1 Operat...

Страница 13: ...rd rate to ASHRAE standards BASIC INSTALLATION 1 Make sure power is turned off to the unit 2 Follow steps beginning on page 2 for installation for standard control and vent assembly then proceed with...

Страница 14: ...on with Controller For High Altitude Installations CAL Used for Field Calibration 1 Damper should be fully closed at 700 ppm if not Potentiometer R7 can be adjusted clockwise CW to close it If it is f...

Страница 15: ...ir damper built in with positive closed position Provides exhaust air capability to prevent pressurization of tight buildings Actuator motor 24 volt power open spring return with built in torque limit...

Страница 16: ...al 2100 457D Page 16 of 16 A call for cooling cycles the compressor and dampers remain in the ventilation mode On loss of blower operation CRV closes fully See Figure 8 FIGURE 8 CALL FOR COOLING OPERA...

Отзывы: