
Manual 2100-457D
Page
2 of 16
CONTENTS
General
General Information .................................................. 3
Unpacking ................................................................. 3
Description ................................................................ 3
Models
................................................................. 3
Installation
Basic Installation ....................................................4-8
Blade Adjustment for Desired Ventilator Air ............ 10
Adding Optional CO
2
Control Sensor ...................... 13
Commercial Room Ventilator Sequence .........15 & 16
Figures
Figure 1 Removal of Exterior Panels ...................... 4
Figure 2 Remove Air Filter & Exhaust Cover Plate ..... 5
Figure 3 Install Ventilator ........................................ 6
Figure 4 Step Control Installation ........................... 8
Figure 5 Damper Control Board ............................. 9
Figure 6 CO
2
Sensor Set-Up (8403-056) ............. 14
Figure 7 Call for Blower Operation ....................... 15
Figure 8 Call for Cooling Operation ...................... 16
Tables
Table 1
................................................................. 4
Graphs
WA3S Ventilation Airflow
......................................... 11
WA4S Ventilation Airflow
......................................... 11
WA5S Ventilation Airflow
......................................... 12
BARD MANUFACTURING COMPANY, INC.
BRYAN, OHIO USA 43506