Adjusting the reed switches on the rotary actuator
Adjust the position of the reed switch of the rotary actuator when the film feed
bridge is in the lower position. This gives a short circuit between the 2 wires of that
reed switch. You can check this with an ohm meter or in LTL by typing “3
FEEDET .”. It should display zero as the result.
Adjust the reed switch of the rotary actuator when the film feed bridge is up. Again
this should give a short circuit checking it with a ohm meter or displaying a zero as
result by typing the command “2 FEEDET .” in LTL. Adjust it in such a way the
detection is positioned in the middle of the detection area.
Adjusting the air bags
1. Give the following command “16 RFDREL”.
This releases the compressed air in the air bags
so that the granite rests on the
three bearing balls
.
2. Check now the height between the upper side of the frame and the bottom of the
support plate of the granite. The height should be 100 mm. You can adapt the
height by turning the lower ball bolt
. !!! When the granit is down be sure that
some bottom parts of the granit are not touching the frame so the granite rests on
the three bearing balls. If so you can adapt the height a bit more than 100mm.
When the correct height is reached you must fix the lower ball bolt with the nut.
Note: When adjusting the height of the ball bolts, first put compressed air in the air
cushions with the command “16 SFDREL” so that no heavy weight is on the ball
bolts.
3. Air bags pressure is around 2,4 bars. Never adjust higher than 4 bar !
3
4
5
1
0
0
Содержание SilverWriter 800
Страница 6: ...Field Service Manual December 2003 Page 6 of 276 ...
Страница 8: ...Field Service Manual December 2003 Page 8 of 276 ...
Страница 18: ...Field Service Manual December 2003 Page 18 of 276 ...
Страница 20: ...Field Service Manual December 2003 Page 20 of 276 ...
Страница 24: ...Field Service Manual December 2003 Page 24 of 276 ...
Страница 75: ...Field Service Manual December 2003 Page 75 of 276 The Vacuum Pump Box Components Layout FIRST LAYOUT ...
Страница 91: ...Field Service Manual December 2003 Page 91 of 276 Electrical Devices Power panel With MM750 With MM440 ...
Страница 93: ...Field Service Manual December 2003 Page 93 of 276 Film feeder solid state panel Solid state Panels ...
Страница 95: ...Field Service Manual December 2003 Page 95 of 276 Multi FilmFeeder solid state panel ...
Страница 96: ...Field Service Manual December 2003 Page 96 of 276 ...
Страница 122: ...Field Service Manual December 2003 Page 122 of 276 ...
Страница 130: ...Field Service Manual December 2003 Page 130 of 276 ...
Страница 134: ...Field Service Manual December 2003 Page 134 of 276 ...
Страница 168: ......
Страница 172: ...Field Service Manual December 2003 Page 172 of 276 ...
Страница 174: ...Field Service Manual December 2003 Page 174 of 276 ...
Страница 187: ...Field Service Manual December 2003 Page 187 of 276 ...
Страница 216: ...Field Service Manual December 2003 Page 216 of 276 ...
Страница 220: ...Field Service Manual December 2003 Page 220 of 276 Main directory structure ...
Страница 225: ...Field Service Manual December 2003 Page 225 of 276 Adding a DPF file in the plotter queue ...
Страница 227: ...Field Service Manual December 2003 Page 227 of 276 Stop logging ...
Страница 234: ...Field Service Manual December 2003 Page 234 of 276 ...
Страница 240: ...Field Service Manual December 2003 Page 240 of 276 ...
Страница 242: ...Field Service Manual December 2003 Page 242 of 276 ...
Страница 246: ...Field Service Manual December 2003 Page 246 of 276 ...
Страница 248: ...Field Service Manual December 2003 Page 248 of 276 ...
Страница 252: ...Field Service Manual December 2003 Page 252 of 276 ...
Страница 268: ...Field Service Manual December 2003 Page 268 of 276 ...
Страница 270: ...Field Service Manual December 2003 Page 270 of 276 ...
Страница 274: ...Field Service Manual December 2003 Page 274 of 276 ...