6. EM GUI orientation
6.17 Con
fi
guration Menu >Linking
General
This part of the System con
fi
guration page lists devices available on the local network and allows adding them to a Linked System
Set up.
The Link cards allow for linking multiple Event Master units. Depending on the linking con
fi
guration, linked units share inputs, and
they expand the number of layers and outputs. For example, with code release 1.5, 2 E2 units can be linked.
Just as in section"Con
guration Menu > Network resource area", page 98, the unit that is supposed to be added is available in the
network resource tab. Any second unit can be added, it only needs to have a separate Unit ID. Change the Unit ID of each system
to be different. The default Unit ID is 0 on all Event Master presentation switchers—E2, S3-4K, and EX. On one of the E2s change
the Unit ID to 1 from the front panel, or by temporarily adding them as separate systems.
A second E2 or S3–4K unit adds fully double capacity from one unit. There are very few limitations to the capacity and operation is
all in all the same as for one unit.
After linking chassis, a few menus provide the option of changing between which unit controls you are view-
ing.
From the Menu bar at the top of all pages, you can select which processor’s details you are viewing, by se-
lecting that processor from the pull down menu.
There is no relationship between Unit ID and Master or Slave selection. Either unit can be Master or Slave
in a linked con
fi
guration. The only real signi
fi
cance—but totally transparent to users—is the Event Master
Toolset communicates only with the Master unit. The Master unit establishes its own connection and handles
all communications with the Slave.
Certain con
fi
guration setups are not allowed. These include spanning input or output con
fi
gurations between
an E2 and an S3–4K. If your setup requires this kind of con
fi
guration, then you must link together two E2 units
or two S3–4K units.
How to Link Two E2 Units
Each E2 comes equipped with two Link cards, always located in slots 1 and 2. Link cards are identi
fi
ed by a yellow stripe at the top.
Make sure to use the locking mechanism and then push each cable until it locks in place.
Connect the Link cables provided with each E2 between the Link connectors as follows:
•
VP ID 0, Link Card slot 1, Link 1 >> VP ID 1, Link Card slot 1, Link 2
•
VP ID 0, Link Card slot 1, Link 2 >> VP ID 1, Link Card slot 1, Link 1
•
VP ID 0, Link Card slot 2, Link 1 >> VP ID 1, Link Card slot 2, Link 2
•
VP ID 0, Link Card slot 2, Link 2 >> VP ID 1, Link Card slot 2, Link 1
See image 6-29 for an example of the cabling between two E2 units.
R5905948 EVENT MASTER DEVICES 17/07/2017
139
Содержание S3 series
Страница 1: ...Event Master Devices User s Guide R5905948 05 17 07 2017 ...
Страница 9: ...Table of contents Index 531 R5905948 EVENT MASTER DEVICES 17 07 2017 5 ...
Страница 10: ...Table of contents 6 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 20: ...2 Safety 16 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 66: ...4 Hardware orientation 62 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 90: ...5 Front Panel Menu orientation 86 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 264: ...8 Updating firmware 260 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 268: ...9 General operation example Image 9 3 264 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 285: ...9 General operation example Image 9 25 R5905948 EVENT MASTER DEVICES 17 07 2017 281 ...
Страница 288: ...9 General operation example 284 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 316: ...10 Controller orientation 312 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 326: ...11 Controller Configuration 322 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 352: ...12 Controller Operation 348 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 356: ...13 E2 Maintenance 13 2 Process Overview Flow chart Image 13 2 352 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 417: ...13 E2 Maintenance Disregard the heatsink from the spare kit R5905948 EVENT MASTER DEVICES 17 07 2017 413 ...
Страница 418: ...13 E2 Maintenance 414 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 422: ...14 S3 Maintenance 14 2 Process Overview Flow chart Image 14 2 418 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 488: ...16 EC 200 Maintenance 484 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 494: ...17 Environmental information 490 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 512: ...A Specifications 508 R5905948 EVENT MASTER DEVICES 17 07 2017 ...
Страница 527: ...C Troubleshooting C TROUBLESHOOTING R5905948 EVENT MASTER DEVICES 17 07 2017 523 ...
Страница 528: ...C Troubleshooting 524 R5905948 EVENT MASTER DEVICES 17 07 2017 ...