Pre-Installation requirements
Barco - OV-808, OV-815– R599874 – installation manual – revision 01– November 2007
______________________________________________________________________
8
2.3
Floor requirements
Sufficient floor space and maintenance area must be available when installing a display wall. (see applicable
drawing and
Access
)
The floor must have sufficient load carrying capability to withstand weight distribution for all feet (see technical
specifications mechanical construction). It must not sag by more than 1 mm under the load of the display wall.
No installation (venting ducts, sockets etc.) must be present in the floor in the area of the feet. (Advice: An area
of at least 150mm must be kept free around each foot.)
The total construction has to be fixed to the floor. Typical, M10 plugs will be mounted in holes in the floor. If
raised floor (false floor) is used, it’s advised to put the construction on the concrete floor underneath.
2.4
Luminance
Light falling directly on the screen will negatively influence the resulting contrast level. The design of the
lighting should avoid as much as possible light falling directly on to the screen. The real performance of the
projectors will be determined by the light condition on the screen. A good contrast ratio is guaranteed with light
input directly on the screen not more than 50 lux.
There are no constraints on the luminance on e.g. the operator positions.
Light behind the wall is required for installation and service. During normal operations all lights behind the wall
must be switched off. All daylight must be avoided as well.
Bright colors for the ceiling, the walls and floor surrounding the screen have to be avoided. Do not use reflecting
materials for the ceiling, the walls and floor surrounding the screen.
Sufficient lighting in the projection room is required during installation.
2.5
Access
The buildings have to be accessible during extended straight time, 6AM – 12PM, 7 days per week.
From the delivery point to the installation site, the doors and passages require a minimum width of 1500mm
and height of 2000mm for an installation.
In case the projection-room is located on the ground floor the room need to be accessible with any trolley.
In case the projection-room is located on a floor level an elevator is required.
The elevator needs a minimum entrance and cabin size of 1500 x 1800 x 1200mm (width x height x depth). The
support power must be 1000 kg minimum. The elevator must be available during the installation period.
2.6
Installation and room requirements.
In case the display wall is integrated in a wall, the gap between screen and wall must be constructed as detailed
in the mechanical drawings (front, top, and side view). Typical 100mm before mounting of the trim.
The installation room must be sufficiently high. Sufficient space (recommended > 200mm) must be provided
above the display wall.
A system responsible must be available during the installation for practical arrangements and safety reasons.
Free telephone access needs to be available for local communication.
2.7
Footprint
This footprint can be used to help you set out the wall configuration the room where the wall will be installed.
2.8
Overall dimensions
The installation room must be sufficient high. Sufficient space (recommended >200mm from top of the screen to
finished ceiling) must be provided above the display wall. The standard support with adjustable feet results in
the lower screen edge to be at a distance of 1200mm. Other heights are available on request with a minimum of
540mm.