background image

2. Installation requirements

8

R5976832 OLITE RENTAL DISPLAY 15/12/2004

Содержание OLite 510

Страница 1: ...OLite rental display Installation manual R5976832 00 15 12 2004...

Страница 2: ...Barco nv Events Noordlaan 5 B 8520 Kuurne Phone 32 56 36 89 70 Fax 32 56 36 88 24 E mail events barco com Visit us at the web www barco com Printed in Belgium...

Страница 3: ...aints The period of guarantee begins on the date of transfer of risks in the case of special systems and software on the date of commissioning at latest 30 days after the transfer of risks In the even...

Страница 4: ......

Страница 5: ...OLite rental tile 29 7 6 Attach an OLite rental tile upon an OLite rental foot 30 7 7 Attach OLite rental tiles on top of each other 31 7 8 Attach OLite rental tiles next to each other 31 7 9 Install...

Страница 6: ...Table of contents C Order info 65 C 1 Spare part order info 65 Index 67 2 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 7: ...ate any component Barco uses specific materials and manufacturing processes in order to achieve part strength Consult Barco for assistance with custom applications Always follow Barco installation ins...

Страница 8: ...systems or peripherals specified by the manufacturer or sold with the apparatus Use caution during lifting moving or transporting to avoid damage by possible tipping 1 3 Important warnings Important w...

Страница 9: ...ser serviceable If the power cords are damaged replace only with new ones Never try to repair a power cord Data cables The data cables provided with this system have special properties for safety They...

Страница 10: ...1 Safety 6 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 11: ...face Ballast Depending on the expected wind load the height of the display and the position of the LED wall upon the foot beams somewhere between front and middle additional weight ballast will be req...

Страница 12: ...2 Installation requirements 8 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 13: ...ite rental structure OLite rental foot foot beams and stacker or OLite rental truss beams Rental power box Digitizer Control software Block diagram OLite display system Sources Digitizer Control PC Po...

Страница 14: ...3 System overview 10 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 15: ...with two big cones for easy and fast positioning of the upper rental frame The bottom corners of the OLite rental frame contain a solid locking mechanism operated with a fixed rugged handle no tools...

Страница 16: ...le Introduction OLite module The front of an OLite module consists of a matrix of full color SMD LED s enclosed with a shader and sheltered in an IP65 housing The rear of the OLite module is equipped...

Страница 17: ...h F Hole for thread rolling screw M3 G Red status LED H Green status LED I Heat sink J Power data connector Cables used with an OLite module The interconnection between the OLite modules is done with...

Страница 18: ...ler re sync unit All together covered in an IP65 housing The control box is attached to a mounting plate which makes the replacement of the hole unit mounting plate with control box very easy and with...

Страница 19: ...to sixth string of OLite modules Each output port can place a dedicated color upon the OLite modules This makes the identification of the OLite module strings easier Port 1 Red Port 2 Green Port 3 Bl...

Страница 20: ...cables used between OLite control boxes To meet the demands of each OLite application Barco offers several lengths of data cables to link data from control box to control box Note that the data outpu...

Страница 21: ...omponents of an OLite rental tile Dummy plug for unused power data output ports Image 4 18 Dummy plug Z3499467 for unused output ports of the OLite control box R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 22: ...4 Components of an OLite rental tile 18 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 23: ...se wagon is equipped with eight big tile positioning cones so the rental frames can easily be placed upon the wagon and secured for transport The four castor wheels and the eight handles make the OLit...

Страница 24: ...additional mounting accessories are required as there are the foot beams the OLite rental foot and the OLite rental stacker These accessories are easy to install with a minimum of tools One column of...

Страница 25: ...bolt used to lift up the display and two smaller safety eyebolts to secure the truss beam with the truss installation A B Image 5 5 A OLite single truss beam R9853060 B OLite dual truss beam R9853040...

Страница 26: ...be accessed directly or via the control software e g XLite Toolset This software is designed as a user interface to be used in conjunction with the digitizer and display this can be used when connecte...

Страница 27: ...ximum height of a base stand OLite rental display is 12 tiles high 4 Installation of the required power box es See manual of the used power box for more information about installing the power box es 5...

Страница 28: ...stallation of the control software for the OLite rental display See installation procedure described in the manual of the control software 8 Energize the OLite rental display and start up the control...

Страница 29: ...rental tile upon an OLite rental foot Attach OLite rental tiles on top of each other Attach OLite rental tiles next to each other Install an OLite stacker system Secure a hanging OLite rental display...

Страница 30: ...tiles into the flight case 1 Place an empty open flight case trolley on a level surface to ensure the load will be evenly spread out among the wheels 2 Turn the handles of the locking mechanism of th...

Страница 31: ...lled with four secured and protected OLite rental tiles 7 Place the flight case cover on the flight case trolley and close all four lock handles Warning At least 2 persons are required to lift up the...

Страница 32: ...gap few millimeters between the rental feet Ensure the rental feet are correct and equally oriented Image 7 7 Place all assemblies next to each other 7 Level out the foot beams If necessary place ever...

Страница 33: ...procedure is written and illustrated for a single OLite truss beam The same procedure can be applied for a dual OLite truss beam Four lock handles instead of two have to be manipulated How to attach a...

Страница 34: ...ed out 1 2 Image 7 11 Place the tile locking mechanisms in the unlocked position 3 Place the OLite rental tile upon the OLite rental foot Ensure that the tile and the foot are equally oriented Tip Use...

Страница 35: ...n top of another OLite rental tile 3 Lock the two tiles together by pushing the handles of the upper tile inside and then turn the handles in horizontal position The left handle in clockwise direction...

Страница 36: ...7 9 Install an OLite stacker system OLite stacker An OLite stacker is installed opposite every adjoining edge of two OLite rental columns and is required for OLite displays higher than two OLite tiles...

Страница 37: ...re the bridge with a lock key and two spring cotters Note The small handle to operate the side locking mechanism has to stand in vertical position otherwise the handle gets in the way to install the s...

Страница 38: ...sary parts Safety steel cables or chains How to secure a hanging OLite rental display 1 Lift up the OLite display to the desired height 2 Place a safety steel cable or chain around the truss installat...

Страница 39: ...are placed in succession from left to right or right to left and row by row WARNING The foot beams on which the OLite rental feet are mounted must be firmly attach to the ground with fixings or ballas...

Страница 40: ...31 Note The OLite rental tile final approach must be 45 degrees for flush fitting Image 7 21 Install first tile Image 7 22 Install second tile Image 7 23 Install first row of tiles 3 Install the seco...

Страница 41: ...er upon the previous installed stacker Note Only the vertical stacker profile and the stacker bridge have to be installed now The lower vertical profile functions as stacker foot for the above vertica...

Страница 42: ...beams 1 Ensure you understand and follow all the safety guidelines safety instructions and warnings mentioned in the chapter Safety page 3 of this manual 2 Place as much flight cases without cover ne...

Страница 43: ...oad Never put extra load on a flight case trolley Keep approximately 2 mm between the undermost OLite tiles hanging on the hoist and the next row of OLite tiles standing in the flight cases underneath...

Страница 44: ...two 10 Repeat from step 7 until the complete OLite display is constructed Image 7 36 Rotated the flight cases and construct a new row of tiles Image 7 37 Place the next row of tiles underneath the su...

Страница 45: ...next row of tiles Image 7 39 Place the next row of tiles underneath the suspended rows Image 7 40 Attach and lift up the next row of tiles WARNING The maximum height of a hanging OLite rental display...

Страница 46: ...7 Basic set up procedures 42 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 47: ...outdoor input and output sockets of OLite rental tiles and all plug holder clamps must be locked firmly WARNING Be sure that the connector sockets are provided with sealing rings before plugging in t...

Страница 48: ...OLite display 3 Place a power linking cable between the tile receiving power directly from the power box via a power source cable and the tile above 4 Place a dummy power plug on the power output soc...

Страница 49: ...equipped with Barco s outdoor connector sockets When using a Ambient Environment Controller AEC the data connection of the AEC is inserted between two OLite tiles The AEC is also equipped with Barco s...

Страница 50: ...our OLite cable strings with 16 module plugs Two dummy plugs for unused output ports of the OLite control box How to realize the cabling between OLite module and OLite controller box 1 Ensure that all...

Страница 51: ...lustrated in image 8 4 6 Place a dummy plug on the unused output ports 5 and 6 of the OLite control box Warning To meet the demands of the IP65 protection norm a dummy plug must be placed on the every...

Страница 52: ...8 Cabling of an OLite rental display 48 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 53: ...and data linking cable Make sure that all plug holder clamps are locked firmly 2 Ensure that the unused output ports of the control box are sealed with a dummy plug 3 Vaporize through different direct...

Страница 54: ...9 Maintenance 50 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 55: ...for security wear deformation corrosion and any other circumstances that may affect the load handling capability of the part Do not modify and or replicate any component Barco uses specific materials...

Страница 56: ...the same replace the control box If only the status of this module remains the same replace this OLite module Flashing 500 ms Flashing 160 ms OLite module functions normal 10 3 Replace the OLite contr...

Страница 57: ...ch plug of the cable strings is turned clockwise as far as possible 10 4 Replace an OLite module without replacement tool WARNING Apply this procedure only on OLite tiles which are standing free on th...

Страница 58: ...hrough the grid opening if required 6 Snap in a new OLite module from the front of the tile Caution Ensure to orient the OLite module correctly while snapping in Shaders above the LED s 7 Connect the...

Страница 59: ...s of an OLite rental tile Dimensions OLite frame 896 mm 672 mm 703 mm 276 mm 396 mm 246 mm 294 mm Image A 1 Dimensions OLite frame with modules 896 mm 672 mm 703 mm 262 42 mm 310 42 mm Image A 2 R5976...

Страница 60: ...6 42 41 8 83 6 41 8 5 8 52 5 100 111 6 Image A 3 Dimensions given in millimeters A 3 Dimensions of an OLite control box Dimensions 107 145 290 364 373 77 296 5 324 285 132 6 Image A 4 Dimensions given...

Страница 61: ...case Dimensions 1440 mm 1384 mm 960 mm 979 5 mm 880 mm Image A 5 A 5 Dimensions of an OLite truss beam Dimensions single truss beam 891 150 109 140 260 308 13 Image A 6 Dimensions given in millimeter...

Страница 62: ...m 1787 220 109 140 260 308 Image A 7 Dimensions given in millimeters A 6 Dimensions of an OLite foot Dimensions 120 180 119 15 150 15 249 5 892 704 8 40 Image A 8 Dimensions given in millimeters 58 R5...

Страница 63: ...stacker system Dimensions stacker foot 690 mm 119 15 mm 262 mm Image A 9 Dimensions stacker profile 1394 mm 200 mm 110 6 mm Image A 10 Dimensions stacker bridge 602 mm 117 6 mm 200 mm Image A 11 R597...

Страница 64: ...A Dimensions 60 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 65: ...t 58 kg including structure Processors 15 8 bit color 50Hz Colors 185 trillion Refresh rate 800 Hz PAL NTSC minimum Temperature range operating 20 45 C 4 113 F storage 20 60 C 4 140 F Humidity operati...

Страница 66: ...t the front of the foot beams Single OLite rental foot Height Tiles 1 2 meter foot beams Minimum ballast kg 2 4 meter foot beams Minimum ballast kg 4 meter foot beams Minimum ballast kg 1 98 46 27 2 1...

Страница 67: ...pon the last 30 cm of the foot beams Ground pressure of an OLite display installed at the front of the foot beams Single OLite rental foot 1 2 meter foot beams 2 4 meter foot beams 4 meter foot beams...

Страница 68: ...683 0 00330 0 01010 0 003301 4 0 08654 0 00849 0 02500 0 00491 0 01346 0 004402 5 0 12179 0 01195 0 03446 0 00676 0 01683 0 005502 6 0 16378 0 01607 0 04543 0 00981 0 02019 0 006603 7 0 21218 0 02081...

Страница 69: ...9850150 Power link cable of 4 5 meter R9850260 Power link cable of 9 meter R9850280 Five dummy power plugs for power output sockets R9850210 Data linking cable of 1 5 meter R9850220 Data linking cable...

Страница 70: ...C Order info 66 R5976832 OLITE RENTAL DISPLAY 15 12 2004...

Страница 71: ...stacker 32 Installation 7 Requirements 7 Introduction 9 M Maintenance 49 O OLite control box 14 52 Replace 52 OLite feet 27 OLite module 12 51 53 Diagnostic 51 Replace 53 OLite module cabling 46 OLite...

Отзывы: