![Barco ILite 6 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/barco/ilite-6/ilite-6_service-manual_3961266051.webp)
6. Tile reassembling
6.11 Installing the re-sync unit
Necessary tools
Slot screwdriver (100 x 4 mm).
How to install the re-sync unit on the ILite tile ?
1. Place the re-sync unit (M) into position.
Caution:
Be careful with the board to board connectors between the re-sync unit and the controller unit underneath.
M
Image 6-18
2. Fasten the two captive screws of the re-sync unit (M) using a slot screwdriver.
R5976865 ILITE 6/8/10/12 DISPLAY 14/12/2007
47
Содержание ILite 6
Страница 1: ...ILite 6 8 10 12 display Service manual R5976865 02 14 12 2007...
Страница 4: ......
Страница 6: ...Table of contents 2 R5976865 ILITE 6 8 10 12 DISPLAY 14 12 2007...
Страница 12: ...2 General 8 R5976865 ILITE 6 8 10 12 DISPLAY 14 12 2007...
Страница 16: ...3 Diagnostic 12 R5976865 ILITE 6 8 10 12 DISPLAY 14 12 2007...
Страница 22: ...4 Troubleshooting 18 R5976865 ILITE 6 8 10 12 DISPLAY 14 12 2007...
Страница 45: ...6 Tile reassembling Image 6 11 R5976865 ILITE 6 8 10 12 DISPLAY 14 12 2007 41...
Страница 52: ...6 Tile reassembling 48 R5976865 ILITE 6 8 10 12 DISPLAY 14 12 2007...
Страница 68: ...A On screen display messages 64 R5976865 ILITE 6 8 10 12 DISPLAY 14 12 2007...