1. DP4K-L series accessory kit
4. Open the clamps for the hoses. Use a 3mm Allen wrench to release the two screws (reference 4 im-
5. Connect the hoses with the projector and guide the hose through the support frame.
Caution:
Ensure to connect the hoses correctly. See labeling on the hoses and projector. For detailed
instructions see installation manual of the projector.
Caution:
Do not interchange the different cooling circuits with each other! Otherwise the system will
fail.
Caution:
The minimum bend radius of the hoses is 30 centimeter.
Note:
Depending on the projector type six or four hoses have to be installed.
6. Close both clamps and fasten with a screw (reference 4 image 1-12). Use a 3mm Allen wrench.
4
Image 1-12
1.6
Installing insulation shells projector side hoses upwards
Necessary parts
•
Insulation shells hoses projector rear-left side upwards.
•
Insulation shells hoses projector rear-right side.
How to install the insulation shells for hoses upwards oriented?
1. Check if the insulation shells to install are the correct one. Two sets are needed. One marked with text
’LEFT SIDE HOSES UP’ and one marked with the text ’RIGHT SIDE’.
2. Disassemble one set by removing the two spring cotters (reference 8 image 1-13) and pull out the pins
(reference 7 image 1-13).
3. Pivot the upper insulation shell (smallest piece, reference 5 image 1-13) into position as illustrated.
4. Place the lower insulation shell into position (reference 6 image 1-13).
Caution:
In case the projector model has only 4 hoses then insert the dummy sealing block (reference
10 image 1-5) in the free slots of the insulation shells.
5. Join both insulation shells together by inserting the two pins (reference 7 image 1-13). Secure each pin
with a spring cotter (reference 8 image 1-13).
R5905882 DP4K-L ACCESSORY KIT 06/09/2017
9