28
MAINTENANCE LIST
Table 3 maintenance list
Time interval(month))
1
3
6
12
Hydraulic system
1
Check the hydraulic oil cylinder, piston for damage and leakage
2
Check whether there is damage and leakage of hydraulic fittings and tubing
3
Check the hydraulic oil level if necessary, to fill again
4
Refill the hydraulic oil(12 months or 1500 hours of work)
5
Check and adjust the function of pressure valve(1200 /1600/2000 kg +0/ +10%)
Mechanical systems
6
Check whether the goods fork deformation and cracks
7
Check whether the base deformation and cracks
8
Check whether all the screws are completely fixed
9
Inspection door frame and chain whether there is corrosion, deformation or damaged,
replace if necessary
10
Check if there is a noise and leakage of gear box
11
Check whether the wheel is the deformation and damage, replace if necessary
12
Lubrication to bearing
13
Check and lubrication pivot point
14
Lubricating grease nipple
Electrical system
15
Check whether the wire is damaged
16
Check the electrical connections and terminal
17
Detect abrupt stop switch function
18
Check whether there is electric drive motor noise and damage
19
Test the monitor
20
Check whether or not to use the correct fuse, replace if necessary
21
Test buzzer
22
Check the contactor
23
Check the frame for leakage( insulation test)
24
Check the function of the accelerator and wear conditions
25
Check the drive motor of electric system
Braking system
26
Check the brake performance, such as replacement of brake disc or adjust the air gap is
necessary
Battery
27
Check the battery voltage
28
Clean and grease to the terminal, and check for corrosion and damage
29
Check whether the battery shell is damaged
Charger
30
Check the power cord is damaged
31
Check in the process of charging start protection
Function
32
Test buzzer
Содержание EP16-N01
Страница 13: ...13 CONTROL HANDLE 5 Safety switch 15 Lifting switch 4 Drive control switch 14 horn button 5 4 14 15 ...
Страница 15: ...15 other 8 1 Drive control Ac speed control 8 4 According to the EN12053 driver s ear noise level dB A 69 ...
Страница 17: ...17 3 ELECTRICAL SYSTEM 3 1 ELECTRIC DIAGRAM Electric diagram FUSE01 150A FUSE02 80 A FUSE1 10 A ...
Страница 18: ...18 3 2 ELECTRIC INSTALLATION Electrical assembly ...
Страница 36: ...36 3 To get off four bolts fixed controller one on each corner can change the electric control ...
Страница 48: ...48 Unscrew five screws take out the wheels can be replaced ...
Страница 56: ...56 5 Remove the screws on the fixed plate pull out the connector then you can replace the circuit board ...
Страница 58: ...58 3 Remove the bolts 4 Remove the wheels ...
Страница 59: ...59 5 Remove the shaft with punch can replace the roller ...
Страница 66: ...66 THE ACCELERATOR PORT OR ACCELERATOR BREAK DOWN ...
Страница 67: ...67 ...