background image

(4/6)

EN/ 

BANO TOILET GRAB BAR

CONTENTS:

C

Tiled wooden wall:

Make sure never to perforate wet walls completely. Drill holes with a 6 mm drill bit through the tiles only. 

Clean and fill hole with sealant. Follow the instructions in figure

A

A

PLACEMENT ON WALL:

Please note that the product guarantee only applies when the wall and screws are dimensioned 

according to «Byggebransjens Våtromsnorm» and Bano interface for products mounted in Norway. 

For products mounted in other countries, please note that the product guarantee only applies when 

wall and screws are dimensioned according to national guidelines/regulations and Bano interface.

B

B

1 wc grab bar

2 aluminum covers

1 plastic top cover w. double sided tape

 

Make sure never to perforate wet walls completely. Clean the holes after drilling. Make sure to use 

acid resistant screws and sealant approved for application on wet walls. See figure

A

Tiled concrete wall:

Drill holes using a 12 mm drill bit through the tiles only. Switch to a 10 mm drill bit for further drilling through 

the concrete. Fill the hole with sealant, place a nylon plug in the hole and fill the plug with sealant. 

Se illustration

Other wall materials (bathroom boards, vinyl):

Make sure never to perforate wet walls completely. Drill holes which are dimentioned for said type of wall. 

Fill the hole with sealant, place a nylon plug in the hole and fill the plug with sealant. See illustration

INSTALLATION:

Mount the brackets to the wall with two screws at the lower end and two screws at the upper end of each 

wall bracket as shown in figure       Make sure to use acid resistant screws.

COVER INSTALLATION:

Slide the bracket covers into the wall brackets from above with the bent ends

pointing upwards. Push the end cap in place at the top of the wall brackets

using the double sided tape.
For lagrer illustrations, please see page 2 and 3.

FIXING TO WOODEN WALL

FIXING TO CONCRETE WALL

A

Plaster wall 

Wood

Tiles

Concrete 

4 acid resistant M8x60 mm screws and rivets (delivered separatly)

 

5601-02     Toilet grab bar 900 mm, grey      

5601-B-02 Toilet grab bar 900 mm, black

5608-02     Toilet grab bar 700 mm, grey      

5608-B-02 Toilet grab bar 700 mm, black

Recommended distance from the centre of the toilet to the centre of the toilet grab bar, as well as the distance 

from the floor to screw hole no. 1 (left) and no. 6 (right) is shown in figure 

Measure distances, level the brackets vertical and mark the screw holes No.1-4/5-8 as shown in figure

FIXING TO WALL:

A

B

3

4

1

2

7

8

5

6

C

Отзывы: