9 Checkout Procedures
This section lists the schedule of checkout procedures and describes where each procedure is documented. Checkouts must
be performed as described. Results should be recorded and kept in the appropriate place (for example, near the machine,
and/or in a technical file).
Banner Engineering highly recommends performing the System checkouts as described. However, a Qualified Person (or
team) should evaluate these generic recommendations considering their specific application and determine the appropriate
frequency of checkouts. This will generally be determined by a risk assessment, such as the one contained in ANSI B11.0.
The result of the risk assessment will drive the frequency and content of the periodic checkout procedures and must be
followed.
9.1 Schedule of Checkouts
Checkout cards and this manual can be downloaded at www.bannerengineering.com.
Checkout
Procedure
When to Perform
Where to Find the Procedure
Who Must Perform
the Procedure
Trip Test
At Installation
Any time the System, the guarded machine, or any
part of the application is altered.
Qualified Person
Commissioning
Checkout
At Installation
Whenever changes are made to the System (for
example, either a new configuration of the S4B or
changes to the guarded machine).
on page 36
Qualified Person
Shift/Daily Checkout
At each shift change
Machine setup change
Whenever the System is powered up
During continuous machine run periods, this
checkout should be performed at intervals not to
exceed 24 hours.
Daily Checkout Card
(Banner p/n 230288)
A copy of the checkout results should be recorded
and kept in the appropriate place (for example, near
or on the machine, in the machine's technical file).
Designated Person or
Qualified Person
Semi-Annual
Checkout
Every six months following System installation, or
whenever changes are made to the System (either
a new configuration of the S4B or changes to the
machine).
Semi-Annual Checkout Card
(Banner p/n 230289)
A copy of the checkout results should be recorded
and kept in the appropriate place (for example, near
or on the machine, in the machine's technical file).
Qualified Person
S4B Safety Light Curtain