a) Strip away a minimum of 100 mm to 150 mm (4 in to 6 in) of the red rope sheathing. Additional length of red sheathing

maybe required to be removed depending on total slack in the rope.

b) Using a 4 mm hex wrench, loosen the set screw on the switch fitting.
c) Insert the cable into the center hole in the clamp, pull the excess rope through, and loop the rope back through the

clamp.

d) Pull the cut end of the rope out from the side hole until there is no excess rope in the clamp.
e) Make sure that no red sheathing is within the clamping mechanism.
f) When affixing at the switch (with integral turnbuckle), after the rope has been strung the complete length, pull the cable

so that the approximate tension is achieved.

g) When the tension is correct, tighten the set screw to hold the rope firmly in place.
h) Make sure that the cut ends of the rope do not present a hazard (cutting, scraping, snagging, etc.). Electrical/plastic tape

or plastic tubing can be used to cover any sharp ends of the rope.

Figure 7. Install the Rope with Integral Turnbuckle

 

SW4

 

Tensioning the Rope

After the rope span components are installed, apply tension to the rope until the arrows in the tensioning indicator are centered on

the line in the tension indicator window. This indicates sufficient rope tension. (Contacts 21/22 and 41/42 will close.) Course

tensioning can be accomplished by pulling excess rope through the clamp until the tension indicator is approximately centered and

then re-tightening the clamp. It is recommended that tensioning be accomplished at a median temperature to accommodate

fluctuations.

1. Models

 RP-LS42F-..L with ring connection

: Turn the external turnbuckle until the arrows are centered.

Models 

RP-LS42F-..LF and Tensioning Spring Assembly with Integral Turnbuckle

:

a. Using a 17 mm wrench, make sure that the locking hex-nut is loose from the base of the switch.
b. Using the thumb wheel, rotate the shaft of the switch until the arrows are centered on the tension indicator.
c. Re-tighten the locking hex nut to the base of the switch (do not over tighten).

Figure 8. Tension Indicator Window:

Too little tension shown

Figure 9. Tension Indicator Window:

proper tension shown

Figure 10. Applying tension to the rope (models RP-LS42F-..LF)

2. Reset the latch by pulling on the button until it catches in the armed position.

Figure 11. Reset the latch by achieving the proper tension and pulling the button

Approx. 10 mm (3/8 in.)

3. Pull hard on the rope until the switch trips, release, and reset the latch several times. If the arrows in the tensioning indicator

window do not return to the correct position (centered on the line in the window), further tighten or loosen the rope tension

as needed, until proper tension is shown.

4. Check the tension adjustment periodically to ensure proper operation.

Rope Pull Emergency Stop Switches

 

 

P/N 67709 Rev. C

www.bannerengineering.com - Tel: + 1 888 373 6767

5

Содержание RP-LS42F LE Series

Страница 1: ...22 34 42 13 21 33 41 Run 14 22 34 42 13 21 33 41 Pull Break Note This symbol for a positive opening safety contact IEC 60947 5 1 is used in the switching diagram to identify the point in actuator tra...

Страница 2: ...cable pull The rope or cable pull as well as any flags or markers must be colored RED The rope or cable pull must have the capability to react to a force in any direction This requires a spring at the...

Страница 3: ...mbly RPA S4 1 or RPA S6 1 eye bolt to an anchor that is solid and stationary and can withstand the constant tension and pull of the rope Do not exceed the maximum length for the specific switch 3 For...

Страница 4: ...edian position to allow for adjustment in both directions b Attach the prepared turnbuckle to the rope using a thimble clamp loop Keep the rope s PVC cover intact along its complete length except wher...

Страница 5: ...e accomplished by pulling excess rope through the clamp until the tension indicator is approximately centered and then re tightening the clamp It is recommended that tensioning be accomplished at a me...

Страница 6: ...s to the terminals 1 Insert the screwdriver blade flat 2 5 mm into the slot next to the desired wiring terminal 2 Twist the screwdriver blade 45 in the slot to open the terminal jaws insert the wire 6...

Страница 7: ...series Never connect the contacts of multiple switches in parallel Individually actuate engage each device then release or re arm and reset the safety module This allows the module to check each switc...

Страница 8: ...Type gG Recommend external fusing or overload protection B10d 1 x 105 cycles at DC 13 24 V Ie2 0 1 A Mechanical Life 1 x 105 switching cycles maximum according to IEC 60947 5 5 Wire Connections 8 x ca...

Страница 9: ...ion 130 mm 5 in flying lead wires 1 each 30 27 M20 X 1 5 SI K30LRXX7P 1 RED indication 1 each SI K30LYRX7P 2 YELLOW RED indication 1 each Cable Gland Model Size For Cable Diameter Dimensions Used With...

Страница 10: ...8 ft 3 mm steel wire rope with 0 5 mm red PVC jacket unterminated RPA C2 20 20 m 65 6 ft RPA C2 40 40 m 131 2 ft RPA C2 50 50 m 164 0 ft RPA C2 80 80 m 262 4 ft Model Quantity Description Thimble RPA...

Страница 11: ...Turnbuckle Each RPAK C2SBP 1 0 5 m 1 5 ft 2 2 RPAK CH2 10 10 m 32 8 ft 4 4 3 RPAK CHP2 10 4 4 3 3 RPAK CH2 10 TA 4 4 3 1 RPAK CHP2 10 TA 4 4 3 3 1 RPAK CH2 20 20 m 65 6 ft 4 4 6 RPAK CHP2 20 4 4 6 6...

Страница 12: ...IVE AND IN LIEU OF ALL OTHER WARRANTIES WHETHER EXPRESS OR IMPLIED INCLUDING WITHOUT LIMITATION ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE AND WHETHER ARISING UNDER COURSE OF...

Отзывы: