UK
DSC
10
TESTING
MAINTENANCE
2) TEST with voltage 24Vac-dc
• Leave terminals 3 and 4 unconnected
• Connect the TEST between terminals 7 and 8.
If connected to Gi.Bi.Di. low-voltage control units, the board TEST function may not be available when the
port is inactive (closed); check that it is properly powered at the beginning of the cycle.
The most important test phases are described below and must be carried out by qualified personnel in full
compliance with the current laws and regulations:
• Read the instructions given under installation warnings
• Check the resistance value of the sensing device dopo: (8K2±10%)
• Connect the sensing device and check that the three LEDs CH1, CH2 and ALIM. come on.
• Activate the sensing device and check that the red LED CH1 and the red LED CH2 go off siultaneously.
• Deactivate the sensing device and check that the two LEDs come on again immediately.
Gi.Bi.Di. recommends regular maintenance every 12 months by qualified personnel in order to assure
safety according to current regulations.
DSC80 DISPOSAL
Gi.Bi.Di advises recycling the plastic components and to dispose of them at special
authorised centres for electronic components thus protecting the environment from
polluting substances.
Normally OPEN
Normally OPEN
Normally CLOSED (TEST)
24V
24V
0 TEST
Содержание AS05080
Страница 42: ...DSC 42 NOTE...