![BANDELIN UR 1 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/bandelin/ur-1/ur-1_instructions-for-use-manual_3722388016.webp)
4/
Preparation for operation
16/38
1786-001 en/2022-08
4.3 Conduct a function test
Requirement
• The ultrasound bath has adapted to the climatic conditions at
the installation site for at least 2?°?hours.
Procedure
1. Make sure that the ultrasound bath is switched off. The turning
knob to set the ultrasound duration must be set to “0”. If pres-
ent, the turning knob to set the heating temperature must be
set to “°C”, or the toggle switch must be in the left position
("0").
2. Plug the power cord of the ultrasound bath into a socket with
earthing contact.
3. Briefly switch on the ultrasound. To do this, turn the knob to the
right for the ultrasound duration, and turn it back to “0” after 1
to 2 seconds.
Results
» A distinct sound can be heard when the ultrasound is turned on.
If there is no sound, contact Service.
A foil test should be carried out before first use. This serves to doc-
ument the effect of the ultrasound. See chapter
.
4.4 Rinsing out the oscillating tank
Thoroughly rinse the ultrasound bath’s oscillating tank with water
before first use.
In order to protect the surface during transport and storage, the
ultrasound bath is covered with an oily preservative. Before the
ultrasound bath is put into service, this preservative must be
removed with a suitable cleaning agent.
Содержание UR 1
Страница 36: ...8 Device information 36 38 1786 001 en 2022 08...
Страница 37: ...1786 001 en 2022 08 37 38...