23486a GB/2017-10
11 / 32
1
electronic GmbH & Co. KG • Heinrichstraße 3-4 • 12207 Berlin • Deutschland • [email protected]
2 Preparation
Carefully unpack the ultrasonic bath and accessories and inspect them for
completeness or possible transportation damage. If any damage or defects are found,
these must be immediately noti
fi
ed in writing to the transportation company and to the
supplier.
Before operation, the ultrasonic bath should be allowed to stand for 2 hours at its
operating location so that it can adjust to the ambient conditions.
2.1
Scope of delivery
1 Ultrasonic bath, see delivery slip
1 Accessories kit
1 Instruction manual
Additional accessories according to order - see delivery note
2.2
Set-up / assembly
• Place the ultrasonic bath atop a
fi
rm, level and dry surface. In doing so
- observe the maximum weight of the tank, including liquids.
For net weight, see technical data, chapters 1.4.1 and 1.4.2.
- do not block the air supply below the tank.
- guard against moisture and wetness – risk of electric shock.
• W 300:
Operation is not permitted if the legs are not screwed on, this will cause the built-in
fan cooling on the bottom of the device to become inoperable.
Minimum distance to the ground: 30 mm!
The ultrasonic bath will become critically damaged without cooling.
Set-up
Fully remove transportation aids (pallets, transport safety devices).
The height-adjustable legs provided should be mounted on the bottom of the tank.
The tank must then be horizontally levelled.
Set up the ultrasonic bath in a dry room.
Assemble the ball valve, hose sockets and hose included in the delivery, as follows: