IT5000-C / IT6000-C
3/8” IT Tool
www.BAND-IT-IDEX.com
Document # P48850 Rev. C
© Copyright
BAND-IT-IDEX, Inc. 2015
All rights reserved
Page 29 of 36
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925
Operating
Manual
1) Remove the two e-style
retaining rings and two clevis
pins. Remove the
maintenance cover.
2) Remove the tension block
assembly by lifting it out of
tension arm slot. Tension block
may come out with
maintenance cover.
3) Fully clean and lubricate inside
of maintenance cover as
shown.
Maintenance: Maintenance Cover
Important:
Before disassembling tool, be sure to shut-off air supply on the
Control Module.
Note
: This tool uses metric fasteners.
Tension
Block
Assembly
***Continued on next page***
Lightly lubricate all
points indicated
with red arrows
.
Maintenance Cover