IT1000-C / IT2000-C
1/4” IT
Tool
www.BAND-IT-IDEX.com
Document # P49050 Rev. C
© Copyright
BAND-IT-IDEX, Inc. 2015
All rights reserved
Page 34 of 36
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925
Operating
Manual
Tool Cavity
The recommended lubricant is Chevron Rykotac Grease EP.
Lightly lubricate all points
indicated with red arrows
.
1) Lubricate tool cavity as shown with red arrows below. Also, lubricate the inside surfaces of
the maintenance cover (shown below).
2) BAND-IT recommends lubrication every 25,000 clamps. Dirty environments may require
more frequent intervals.
3) Inspect all mechanical linkages for lubrication and proper placement. Refit cover.
4) Secure the tool side cover by inserting and tightening the screws to 20-30 in-lbs removed
on the previous page’s steps. Apply medium strength blue Loctite to the 3 cap screws and
high strength red Loctite to the one flat head screw.
Maintenance: Lubrication
Important:
Before disassembling tool, be sure to shut-off air supply on the
Control Module.
Note
: This tool uses metric fasteners.