manualshive.com logo in svg
background image

 

 

 

BAND-IT-IDEX, Inc. 
A Unit of IDEX Corporation 
4799 Dahlia Street 
Denver, CO 80216-3070 USA 
P: 1-800-525-0758 
F: 1-800-624-3925

 

Document # P46050 rev. - 

© Copyright 

BAND-IT-IDEX, Inc. 2008 

All rights reserved 

www.BAND-IT-IDEX.com 

 

Page 1 of 4 

GRC001 Hand Tool

Operating 
Instructions 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

1. Band may be used from bulk roll as 
this

 completely eliminates waste of 

band

. Slide buckle on band as shown, 

bringing end of band around object to 
be clamped and again through buckle. 

NOTE: The tension screw thread 
should be lubricated regularly. 

2. Continue band around object once 
more and again through buckle. 

Double banding develops a great deal 
more radial compression than single 
banding.

 Bend end of band under 

buckle. 

4. Place finger on BAND-IT Band at 
buckle bridge while tensioning with tool 
handle. When you feel BAND-IT Band 
stop moving through buckle as you are 
turning handle, 

maximum pressure is 

being exerted by the BAND-IT Band

 

around object being clamped. 

Stop 

turning handle. 

5. 

Roll tool over buckle, backing off 

with tension handle throughout entire 
rolling operation

. Failure to back off 

with tension handle through-out entire 
course of roll-over may result in 
breaking of band. There is no loss of 
tension as band released is used up in 
the bend. 

6. Pull cutting handle to cut the band.  

7. Remove tool, 
holding stub of band 
down with thumb. 

8. Hammer down 
buckle ears to hold 
band stub in place 
to complete BAND-
IT clamp. 

3. Place band in opening of tool nose 
and gripper block. Move into slot as far 
as possible, to avoid buckle sliding into 
tool nose.  Tighten band clamp by 
turning the tension handle clockwise 
while holding band gripper tight against 
band.  

NOTE:  The spring load of the 

band gripper is not intended to secure 
and prevent band from slipping during 
tension process.

 

Отзывы: