ENGLISH
12 / 42
0006160060_201802
BURNER CONNECTION TO THE BOILER
ASSEMBLING THE HEAD UNIT
• Position insulating seal -13 on the sleeve, placing rope -2 between
the flange and the seal.
• Adjust the connection flange -19 position loosening the screws -6.
The burner head must penetrate to the extent requested by the
generator manufacturer.
• Anchor the the head unit to the boiler -1 using the stud bolts,
washers and nuts provided -7.
DANGER / CAUTION
Completely seal the gap between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLING THE GAS TRAIN
The EN 676 approved gas train is sold separately from the burner.
The gas train can be assembled in different ways: -8 and (8a).
Choose the most rational position for the set-up of the boiler room and
the position in which the gas pipeline arrives.
1 13
2
25
18
6
7
0002937450
Содержание TBML 60P
Страница 2: ......
Страница 4: ...ITALIANO 2 42 0006160060_201802 ITALIANO Schemi elettrici 41...
Страница 43: ...ITALIANO 41 42 0006160060_201802 SCHEMI ELETTRICI...
Страница 46: ...ENGLISH 2 42 0006160060_201802 ENGLISH Wiring diagrams 41...
Страница 85: ...ENGLISH 41 42 0006160060_201802 WIRING DIAGRAMS...
Страница 87: ......