BURNER CONNECTION TO THE BOILER
HEAD UNIT ASSEMBLY
•
Adjust the position of the coupling flange (19) by loosening the
screws (6) so that the burner head enters the furnace to the extent
recommended by the generator manufacturer.
•
Position the insulating gasket (13) on the sleeve, by inserting the
cord (2) between the flange and the gasket.
•
Fasten the head unit to the boiler(1) by means of the stud bolts,
washers and the nuts provided (7).
DANGER / ATTENTION
Seal the space between the burner sleeve and the hold on the
refractory material inside the boiler door completely with suitable
material.
ASSEMBLING THE GAS TRAIN
There are different ways of assembling the valve train, as shown in
drawing 0002937060.
Choose the most rational position for the set-up of the boiler room and
the position in which the gas pipeline arrives.
DANGER / ATTENTION
In case of very large valves, e.g. DN65 or DN80, make sure
there is a suitable support to prevent excessive stress on the
gas train fitting.
ASSEMBLY OF VENTILATION SYSTEM
Position the half-hinge on the burner scroll in line with those on the
combustion head assembly.
•
Insert the hinge pin (10) in the position considered most suitable
•
Connect the cables (switch on and ionisation) to the corresponding
electrodes, close the hinge, locking the burner by means of screws
(11).
COMPLETING BURNER SETUP
•
Remove the protective (yellow) caps from the fittings placed beneath
the head unit and near the solenoid valves.
•
Connect the light oil pipes (24) provided with the burner to their cor
-
responding connectors, making sure they are properly sealed.
ENGLISH
10 / 54
0006160337_202006
Содержание 56570010
Страница 2: ......
Страница 44: ...SCHEMI ELETTRICI TBML 80 120 160 ITALIANO 42 54 0006160337_202006...
Страница 45: ...ITALIANO 43 54 0006160337_202006...
Страница 46: ...ITALIANO 44 54 0006160337_202006...
Страница 47: ...ITALIANO 45 54 0006160337_202006...
Страница 48: ...BT1 BA BP I1 I2 I3 I4 ITALIANO 46 54 0006160337_202006...
Страница 50: ...TBML 210 310 ITALIANO 48 54 0006160337_202006...
Страница 51: ...ITALIANO 49 54 0006160337_202006...
Страница 52: ...ITALIANO 50 54 0006160337_202006...
Страница 53: ...ITALIANO 51 54 0006160337_202006...
Страница 54: ...BT1 BA BP I1 I2 I3 I4 ITALIANO 52 54 0006160337_202006...
Страница 56: ...ITALIANO 54 54 0006160337_202006...
Страница 98: ...WIRING DIAGRAMS TBML 80 120 160 ENGLISH 42 54 0006160337_202006...
Страница 99: ...ENGLISH 43 54 0006160337_202006...
Страница 100: ...ENGLISH 44 54 0006160337_202006...
Страница 101: ...ENGLISH 45 54 0006160337_202006...
Страница 102: ...BT1 BA BP I1 I2 I3 I4 ENGLISH 46 54 0006160337_202006...
Страница 104: ...TBML 210 310 ENGLISH 48 54 0006160337_202006...
Страница 105: ...ENGLISH 49 54 0006160337_202006...
Страница 106: ...ENGLISH 50 54 0006160337_202006...
Страница 107: ...ENGLISH 51 54 0006160337_202006...
Страница 108: ...BT1 BA BP I1 I2 I3 I4 ENGLISH 52 54 0006160337_202006...
Страница 110: ...ENGLISH 54 54 0006160337_202006...
Страница 111: ......