ENGLISH
11 / 44
0006160028_201510
BURNER CONNECTION TO THE BOILER
ASSEMBLING THE HEAD UNIT
•
Position insulating seal -13 on the sleeve, placing rope -2
between the flange and the seal.
• Adjust the connection flange -19 position loosening the screws
-6. The burner head must penetrate to the extent requested by
the generator manufacturer.
•
Fasten the burner -18 to the boiler -1 with the stud bolts, wa-
shers and nuts provided -7.
DANGER / CAUTION
Completely seal the gap between the burner sleeve and
the hole in the refractory material inside the boiler door with
suitable material.
ASSEMBLING THE GAS TRAIN
The EN 676 approved gas train is sold separately from the burner.
The gas train can be assembled in different ways: -8 and (8a).
0002937830
13
2
25
6
18
1
7
8
8a
0002937840
Содержание 56460010
Страница 2: ......
Страница 40: ...SCHEMI ELETTRICI ITALIANO 38 44 0006160028_201510...
Страница 41: ...ITALIANO 39 44 0006160028_201510...
Страница 42: ...ITALIANO 40 44 0006160028_201510...
Страница 43: ...ITALIANO 41 44 0006160028_201510...
Страница 44: ...BT1 BA BP I1 I2 I3 I4 ITALIANO 42 44 0006160028_201510...
Страница 46: ...ITALIANO 44 44 0006160028_201510...
Страница 84: ...ENGLISH 38 44 0006160028_201510 WIRING DIAGRAMS...
Страница 85: ...ENGLISH 39 44 0006160028_201510...
Страница 86: ...ENGLISH 40 44 0006160028_201510...
Страница 87: ...ENGLISH 41 44 0006160028_201510...
Страница 88: ...ENGLISH 42 44 0006160028_201510 BT1 BA BP I1 I2 I3 I4...
Страница 90: ...ENGLISH 44 44 0006160028_201510...
Страница 91: ......