Biological control

The growth of algae, slimes and other micro-organisms, if uncontrolled, will reduce system efficiency and may

contribute to the growth of potentially harmful micro-organisms, such as Legionella, in the recirculating water

system.
Accordingly a treatment programme specifically designed to address biological control should be initiated when the

system is first filled with water and administered on a regular base thereafter in accordance with any regulations

(national, regional) that may exist or in accordance with accepted codes of good practice, such as EUROVENT

9-5/6, VDMA Detailsheet 24649 etc.
Also during shutdown periods it is recommended to continue the water treatment programme. Alternatively, the

basin and pump should be drained.
It is strongly recommended to monitor the bacteriological contamination of the recirculating water on a regular base

(for example, TAB test with dip slides on a weekly base) and record all results.
Certain products used for water treatment, particular some dispersant and bio-dispersant additives, might change

the properties of the water (such as the surface tension), which can cause excessive drift loss (water passing

through the eliminators). In such case we recommend to review the water treatment (product type, dosage) with

your water treatment expert.
In case of doubt, a short test can be performed, after cleaning & disinfection, using fresh water without addition of

the concerned chemical (within the limits of the local legislation).

Chemical treatment

1. Water treatment chemicals or non-chemical systems need to be compatible with the materials of construction

used in the cooling system including the evaporative cooling equipment itself.

2. In case of chemical water treatment, chemicals should be added to the recirculating water by an automatic

feed system. This will prevent localised high concentrations of chemicals, which may cause corrosion.

Preferably the water treatment chemicals should be fed into the cooling system at the discharge of the

recirculation pump. The chemicals should not be fed in concentrated form, nor batch fed directly into the cold

water sump of the evaporative cooling equipment.

3. BAC specifically discourages acid dosing as mean of scale control (unless under certain strict circumstances

for open circuit cooling towers with very large system volume and remote sump, or constructed from stainless

steel).

4. A competent water treatment company should be consulted for the specific water treatment programme to be

applied. Next to the supply of dosing and control equipment and chemicals, the programme should include

regular monthly monitoring of the circulating and make up water quality.

5. If it is proposed to operate a treatment programme outside the BAC Water Quality Control Guidelines, the BAC

factory warranty may be invalidated if the water quality is persistently outside the Control Guidelines, unless

specific prior written BAC approval. (Some parameters may be exceeded under certain strict circumstances.)

It is strongly recommended to check the key parameters of the circulating water quality on a monthly base. See

table: "Circulated water quality guidelines". All test results need to be recorded.

Passivation

When new systems are first commissioned, special measures should be taken to ensure that galvanized steel

surfaces are properly passivated to provide maximum protection from corrosion.

Passivation

is the formation of a

protective, passive, oxide layer on galvanized steel surfaces.
To ensure that galvanized steel surfaces are passivated, the pH of circulating water should be kept between 7.0

and 8.2 and calcium hardness between 100 and 300 ppm (as CaCO

3

) for four to eight weeks after start-up, or until

new zinc surfaces turn dull grey in colour. If white deposits form on galvanized steel surfaces after the pH is

returned to normal service levels, it may be necessary to repeat the passivation process.

W W W . B A L T I M O R E A I R C O I L . E U

14

Содержание VFL 241-H

Страница 1: ...VFL Closed Circuit Cooling Towers OPERATING AND MAINTENANCE INSTRUCTIONS MVFLv19EN...

Страница 2: ...nized Codes of Practice such as EUROVENT 9 5 6 ACOP HSC L8 Guide des bonnes pratiques Legionella et tours a ror frig rantes etc Water sampling test results and corrective actions should be recorded in...

Страница 3: ...epends on applied code of practice Notes 1 Water treatment and auxiliary equipment integrated in the cooling system may require additions to the table above Contact suppliers for recommended actions a...

Страница 4: ...14 Passivation 14 Overflow connection 15 4 Cold Weather Operations 16 About cold weather operation 16 Protection against sump water freezing 16 Capacity control 16 Protection against coil freezing 17...

Страница 5: ...W B A L T I M O R E A I R C O I L E U 5 CONSTRUCTION DETAILS 1 Casing 2 Water distribution section 3 High efficiency drift eliminators 4 Forward curved centrifugal fan 5 Fan shaft and bearing 6 Fan mo...

Страница 6: ...for an ambient temperature range from 25 C to 40 C Design pressure max 10 bar Fluid inlet temperature max 82 C Fluid outlet temperature min 10 C Fluids circulated through the inside of the coils must...

Страница 7: ...stem volume per year If the annual make up of the closed system is greater than 15 yearly or if highly corrosive water such as water with very low hardness or alkalinity is used it is recommended to c...

Страница 8: ...ith extra care to prevent accidents CAUTION Do not cover units with PVC eliminators with a plastic tarpaulin Temperature increase due to sun radiation could deform the eliminators AUTHORIZED PERSONNEL...

Страница 9: ...ent of refrigerants if applicable oil and other parts must be done with respect to the environment whilst protecting workers from potential risks related to exposure to harmful substances National and...

Страница 10: ...event of any such defect BAC will repair or provide a replacement For more details please refer to the Limitation of Warranties applicable to and in effect at the time of the sale purchase of these p...

Страница 11: ...thereafter Moreover there must be an ongoing programme of monitoring in place to ensure the water treatment system is maintaining the water quality within the control guidelines Check and adjustments...

Страница 12: ...owed provided the sum of chlorides sulfates parameters does not exceed 650 mg l for Baltibond SST304L Baltiplus protection pH 6 5 to 9 0 pH during initial passivation Below 8 2 Total hardness as CaCO3...

Страница 13: ...ation of sulphates is allowed provided the sum of chlorides sulphates parameters does not exceed 650 mg l for SST304L and 1500 mg l for SST316L For Ozone water treatment application Stainless steel 31...

Страница 14: ...which may cause corrosion Preferably the water treatment chemicals should be fed into the cooling system at the discharge of the recirculation pump The chemicals should not be fed in concentrated for...

Страница 15: ...secondary approach is to conduct a chemical passivation using inorganic phosphate or film forming passivation agents Consult your water treatment specialist for specific recommendation Overflow connec...

Страница 16: ...from wet to dry operation as the sump water is protected at all times For dry operation applications ensure that make up water line is shut off and make up valve completely drained Thermostats for el...

Страница 17: ...ct the pump from running dry in case of make up failure or extreme water loss The status of the alarm can be checked prior to pump start up but should not be considered during the first minute after s...

Страница 18: ...If the process load is extremely light or shut off it may be necessary to apply an auxiliary heat load during freezing conditions Consult your local BAC Balticare representative for advice if these c...

Страница 19: ...M VFL 484 M 23 0 27 2 30 5 30 5 33 8 13 8 14 5 15 2 15 2 15 9 VFL 721 L VFL 721 M VFL 721 O VFL 722 N VFL 722 O VFL 723 L VFL 723 O VFL 724 O 7 9 40 1 40 1 40 1 46 4 46 4 51 5 51 5 56 6 17 8 17 8 17 8...

Страница 20: ...r the basin has been flushed the strainers should be removed cleaned and replaced before refilling the basin with fresh water CAUTION Do not use acid to clean the strainers Remote Basin The water leve...

Страница 21: ...height from sump bottom to water level and compare with face value from table 4 Check valve for leakage and replace valve if necessary 5 Check that float arm can move freely and that float ball floats...

Страница 22: ...ine ensure that the valve is unobstructed and that blow down water can drain freely Measure the blow down flow rate by recording the time needed to fill a given volume For automatic blow down using co...

Страница 23: ...ing 3 Check belt tension by verifying both following conditions The deflection amounts 10 mm m free belt length see figure below The deflection force required is between the minimum and maximum values...

Страница 24: ...nsioned re tighten the locking nuts on the motor base adjusting screws There should be no chirp or squeal when the fan motor is started DRIVE ALIGNMENT Proper drive alignment ensures maximum belt life...

Страница 25: ...nd pumps must rotate in the correct direction which is indicated by arrows on the equipment Check proper functioning as follows 1 Stop fan s and pump s 2 Turn the fan by hand to ensure rotation withou...

Страница 26: ...of mechanical components or operational problems e g unwanted ice formation If this occurs a thorough inspection of the entire unit followed by immediate corrective action is needed If required consul...

Страница 27: ...ly in parallel to it Selecting a coil cleaner is important since the cleaner must neutralise and remove deposits on the surface of the coil BAC does not recommend the use of alkaline and acidic coil c...

Страница 28: ...art fan s and pump s Nozzle spray distribution type FAN SHAFT The exposed areas of the fan shaft are coated with a soft seal for added corrosion protection It is recommended that the coating be inspec...

Страница 29: ...correctly Lubrication FAN SHAFT BEARINGS The fan shaft is supported by ball bearings see figure below Under normal operating conditions the bearings should be greased every 2000 operating hours or at...

Страница 30: ...C Total Fina Elf Multis 3 20 C to 120 C Grease products ADJUSTABLE MOTOR BASE The motor base adjusting screw see figure below should be coated every six months using a good quality corrosion inhibiti...

Страница 31: ...ocal or national guidance also recommends disinfection prior to initial start up after a prolonged shut down after routine cleaning operations or when significant alterations have been made to the coo...

Страница 32: ...parts are used Prolonged outdoor stay Should the unit s be stored outside prior to installation and or start up for approximately one month shelf life or longer or stored in severe climates it is imp...

Страница 33: ...ecomaf 2002 30p Guide des Bonnes Pratiques Legionella et Tours A ror frig rantes Minist res de l Emploi et de la Solidarit Minist re de l Economie des Finances et de l Industrie Minist re de l Environ...

Страница 34: ...W W W B A L T I M O R E A I R C O I L E U 34...

Страница 35: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 36: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 37: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 38: ...AGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS EQUIPMENTS SERVICES www BaltimoreAircoil eu info BaltimoreAircoil eu Please refer to our website for local contact details Industriepark Zone A B 2220...

Отзывы: