background image

2 General information

2 General information

W W W . B A L T I M O R E A I R C O I L . E U

5

GENERAL INFORMATION

Operating conditions

BAC cooling equipment is designed for the operating conditions specified below, which must not be exceeded

during operation.

Wind Load

: For safe operation of unshielded equipment exposed to wind speeds above 120 km/h installed at a

height above 30 m from the ground, contact your local BAC-Balticare representative.

Seismic Risk

: For safe operation of equipment installed in moderate and high hazard area's contact your local

BAC-Balticare representative.

ICE THERMAL STORAGE UNIT

1. For units designed to work with secondary coolants:

-

Fluid compatibility: Fluids circulated through the coil(s) must be compatible with the coil construction

material. Standard coils are constructed of black steel.

-

Coil design pressure: max. 10 bar

-

Max. temperature of fluid: +50°C

-

Min. temperature of fluid: -20°C

The coils are manufactured from black steel and hot dip galvanised after fabrication and may contain certain

contaminants, such as carbon, iron oxide or welding particles.

The installer must take the necessary precautions on site to safeguard the operation of sensitive components

in conjunction with the coils.

PURGE REQUIREMENTS

The installer of BAC equipment must ensure proper system purging of air prior to operation. Entrained air can

obstruct the proper flow of glycol solution, resulting in higher operating pressures than design and reduced thermal

storage capacity.

Connecting pipework

All piping external to BAC cooling equipment must be supported separately.
In case the equipment is installed on vibration rails or springs, the piping must contain compensators to eliminate

vibrations carried through the external pipework.
The equipment outlet piping must be installed under the operating level of the equipment to prevent air suction and

pump cavitation.
All connections in the external pipework (installed by others) must be leak free and tested accordingly.

TSU-M

2

Содержание ICE CHILLER TSU-M

Страница 1: ...TSU M ICE CHILLER Thermal Storage Unit for internal melt OPERATING AND MAINTENANCE INSTRUCTIONS MTSU Mv06EN...

Страница 2: ...the unit s certified drawing available for reference during inspection and maintenance If you do not have a copy of this drawing or need further information about the unit contact your local BAC Servi...

Страница 3: ...Quantity Controller 10 4 Water Care 21 About water care 21 Passivation 21 Special water treatment considerations 22 5 Cold Weather Operations 23 About cold weather operation 23 Protection of operatin...

Страница 4: ...l 2 Coil support beams 3 Glycol connections 4 Galvanised steel coil 5 Watertight covers 6 Primary liner 7 Extruded polystyrene insulation 8 Secondary liner Vapor barrier 9 Sight tube Not shown Ice Inv...

Страница 5: ...ture of fluid 20 C The coils are manufactured from black steel and hot dip galvanised after fabrication and may contain certain contaminants such as carbon iron oxide or welding particles The installe...

Страница 6: ...ll items such as bottom screens ladders safety cages stairways access platforms handrails and toe boards for the safety and convenience of the authorized service and maintenance personnel At no time t...

Страница 7: ...rcumstance can one use parts of the unit that are not designed as an access mean unless measures can be taken to mitigate any risks that might occur from doing so Modifications by others Whenever modi...

Страница 8: ...n the tank and consists of two major components Transmitter box for power supply and passive analogue 4 20 mA output signal A guided wave radar sensor installed in a PVC tube In case the sensor is exp...

Страница 9: ...en charged with a glycol solution of the type and concentration specified 2 Confirm all circulating pumps are rotating in the proper direction 3 Confirm there is sufficient load to discharge the tanks...

Страница 10: ...ution through the coils If complete melt out cannot be accomplished try to melt out as much ice as possible CAUTION Unmelted ice is wasted energy Seasonal Shutdown Ice Chiller Thermal Storage Units in...

Страница 11: ...trol box will provide a passive 4 20 mA output signal where 0 mA stands for 0 ice and 20mA corresponds with 100 ice full ice build W W W B A L T I M O R E A I R C O I L E U 11 3 Operating instructions...

Страница 12: ...C 12 13 normally open NO 14 15 16 Low level alarm contacts 380VAC 10A 24VDC 10A Mac cable section is 2 5mm2 14 16 normally closed NC 15 16 normally open NO Wiring specification OUTPUT SIGNAL GRAPHICS...

Страница 13: ...the button allow to change values dial or navigate through the menu The active line has a mark in front of it Press the black button to continue Following screen appears For standard TSU M models the...

Страница 14: ...ter the screen below Rotate the black button to select Set Zero Level and press to activate Make sure you only do this when no ice is present in the ice tank and when the water level is at the zero le...

Страница 15: ...7 the zero level is not stored In case the sensor is not in the correct position sensor too high or too low to allow a correct full range measurement the display will indicate an error first and the p...

Страница 16: ...set at 3 5mA to indicate a low level alarm If the water level rises above the maximum level the High Level Alarm is activated and Alarm is displayed on the screen The output contact 11 12 13 for high...

Страница 17: ...s are available in the upper or lower area of the screen To select or activate a line press the black button If you want to navigate through the menu or change values or settings rotate the black butt...

Страница 18: ...onfirm the zero setting The display shows Zero Level succesfully changed to confirm the setting If the black button is pressed without dialing 7 the zero level is not stored In case sensor position is...

Страница 19: ...of settings During initial start up the access code is not asked for Rotate the black button to select 2 press to confirm Press 2 more times to confrim next 2 digits Dial then to select 0 and press to...

Страница 20: ...the standard user If you enter the menu you get the following screen Keep pressing the black button to exit You can only enter with the correct code Software Version Press black button to see which s...

Страница 21: ...o 9 0 Hardness as CaCO3 90 to 500 mg l Alkalinity as CaCO3 500 mg l max Total dissolved solids 1000 mg l max Chlorides 125 mg l max Sulfates 125 mg l max Conductivity 100 700 S cm Water quality guidel...

Страница 22: ...tion if the tank water is corrosive in nature low hardness low pH or alkalinity the addition of a corrosion non precipitating corrosion inhibitor is recommended Examples of non precipitating corrosion...

Страница 23: ...ssembly the sight tube assembly and if so equipped the Ice Inventory Sensor must be protected The sight tube and optional inventory sensor must be heat traced and insulated It is not necessary to drai...

Страница 24: ...severe or sustained subfreezing ambient temperatures should be checked before initiating an ice build cycle Ice created by subfreezing ambient temperatures which accumulates at the top of the tank and...

Страница 25: ...have any specific questions please contact your local BAC Balticare service provider or representative whose name e mail and phone number can be found on the website www BACservice eu The model type...

Страница 26: ...approximate volume of water required Model Tank volume liters of water Coil volume liters of glycol solution TSU 237M 11320 985 TSU 476M 22110 1875 TSU 594M 28250 2320 TSU 761M 34640 2990 TSU L184M 88...

Страница 27: ...rrosion protection MUST be repaired as soon as possible to prevent the damage from getting bigger If there is evidence of scale formation more than 0 1 mm or corrosion water treatment regime must be c...

Страница 28: ...0 Ice in the sight tube During normal operation a solid layer of ice at the top of the tank will not form However should such a layer be formed due to unforeseen and unwanted operational circumstance...

Страница 29: ...e your glycol supplier check samples of the glycol solution for the proper level of inhibitors and adjust if necessary W W W B A L T I M O R E A I R C O I L E U 29 6 Maintenance Procedure 6 Maintenanc...

Страница 30: ...stallation and or start up for approximately one month shelf life or longer or stored in severe climates it is imperative that certain actions be performed by the installing contractor in order to mai...

Страница 31: ...comaf 2002 30p Guide des Bonnes Pratiques Legionella et Tours A ror frig rantes Minist res de l Emploi et de la Solidarit Minist re de l Economie des Finances et de l Industrie Minist re de l Environn...

Страница 32: ...W W W B A L T I M O R E A I R C O I L E U 32...

Страница 33: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 34: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 35: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 36: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 37: ...W W W B A L T I M O R E A I R C O I L E U...

Страница 38: ...AGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS EQUIPMENTS SERVICES www BaltimoreAircoil eu info BaltimoreAircoil eu Please refer to our website for local contact details Industriepark Zone A B 2220...

Отзывы: