Baltimore Aircoil Company 3000 Series Скачать руководство пользователя страница 7

7

Maintenance

Procedures

FAN SHAFT BEARINGS:
The fan shaft is supported by two pillow block ball
bearings, each equipped with a lubrication fitting and a
slinger/locking collar to keep out moisture. The bearings
should be lubricated as follows:

Initial Start-Up: Normally no lubrication is required since
the bearings have been lubricated at the factory prior to
shipment. However, if the cooling towers have been stored
at the job site for more than one year, bearings should be
lubricated with new grease before initial operation. When
lubricating, purge the old grease from the bearing by
gradually adding grease until a bead of new grease
appears at the seal on the underside of the bearing.

Seasonal Start-Up: Purge both bearings with new
grease prior to start-up.

Operation: Lubricate bearings after every 2,000 hours of
operation or once every three months, whichever comes
first.

Seasonal Shutdown: Purge bearings with new grease
prior to any prolonged storage or downtime.

The fan shaft bearing should be lubricated only with a
hand grease gun. Do not use high pressure grease
guns since they may rupture the bearing seals.

Lubricate the bearings only with one of the following
water resistant greases 
which are good for ambient
temperatures ranging from –65˚F to +250˚F. 

American – Rycon #3
Keystone – 84 EP Light
Exxon – Beacon #325
Mobil – Mobil #28
Shell – Aeroshell #17
Chevron – SRI

ADJUSTABLE MOTOR BASE:
The motor base adjusting screw (See figure 4 & 5) should
be coated twice a year using a good quality corrosion
inhibiting grease such as one of those recommended for
lubricating the fan shaft bearings.

BALTIDRIVE

®

POWER TRAIN:

The BALTIDRIVE

®

Power Train consists of a specially

designed belt, with corrosion-resistant fan motor sheaves.
The solid-backed, multi-groove, neoprene/polyester belt
provides the premium quality necessary for cooling tower
service. The corrosion-resistant sheaves extend the life of
the belt by minimizing any possibility of rust or corrosion.
These components provide a highly reliable system with
low-maintenance requirements. The only servicing
required on the BALTIDRIVE

®

Power Train is to periodi-

cally check the condition of the belt and, when neces-
sary, adjust the tension. The recommended service
intervals are specified below:

INITIAL START-UP:
No servicing is required prior to initial tower start-up since
the drive has been tensioned and aligned at the factory.

SEASONAL START-UP:
Readjust the tension on the belt.

OPERATION:
After the initial tower start-up or the installation of a
new belt, the tension must be readjusted after the first
24 hours of operation. 
Thereafter, the condition of the
belt should be checked quarterly and the tension adjust-
ed as necessary, but at least once every three months.

To check the belt tension, place a straight edge along the
belt from sheave to sheave as shown in Figure 6a or use
a tape measure as shown in Figure 6b to measure belt
deflection. Apply a moderate force by hand (approximately
40 lbs) evenly across the width of the belt in the center of
the span between the sheaves. If the belt deflects between
1/4" and 3/8" as shown in Figure 6a and 6b, the belt is
adequately tensioned.

(continued)

Adjustable Motor Base – Series 3000 and

Figure 5

Adjustable Motor Base — Series 1500

Figure 4

Содержание 3000 Series

Страница 1: ...ntenance be developed and carried out This bulletin is published as a guide to establishing such a program Included in the bulletin are the recommended services for start up operation and shutdown and...

Страница 2: ...tent of impurities in the air and water determines the frequency of most maintenance services and also governs the extent of water treatment which can vary from a simple continuous bleed and biologica...

Страница 3: ...r property damage All electrical mechanical and rotating machinery constitute a potential hazard particularly for those not familiar with the design construction and operation Accordingly adequate saf...

Страница 4: ...to obtain even water distribution 13 Open the valve in the tower bleed line by others and adjust bleed to the recommended rate See Water Treatment page 10 continued 14 Check the voltage and current o...

Страница 5: ...ically purge the EASY CLEAN Chamber of dirt and debris collected by the strainer The strainer should be cleaned periodically as shown in the Recommended Maintenance Schedule This is accomplished by un...

Страница 6: ...f the thermal load is less than the design load at the time of unit start up the procedure may produce operating levels greater than that shown It may be necessary to re adjust the float in order to a...

Страница 7: ...uch as one of those recommended for lubricating the fan shaft bearings BALTIDRIVE POWER TRAIN The BALTIDRIVE Power Train consists of a specially designed belt with corrosion resistant fan motor sheave...

Страница 8: ...ies 3000 and Series 1500 Cooling Towers are con structed of corrosion resistant materials The wet deck sur face is made of an inert synthetic material which requires no protection against rot decay ru...

Страница 9: ...eration CAUTION The plug must be reinstalled during warm weather to obtain full thermal performance When the cooling tower is operated at wet bulb tempera tures below freezing ice may form on wetted a...

Страница 10: ...M per 100 tons of refrigeration Evaporation Rate Water Flow Rate x Range x 001 Example At a flow rate of 900 GPM and a cooling range of 10 F the evaporation rate is 9 GPM 900 GPM x 10 F x 001 9 GPM If...

Страница 11: ...culating pump They should not be batch fed directly into the cold water basin 3 Acid water treatment is not recommended unless the unit s have been furnished with the BALTIBOND Corrosion Protection Sy...

Страница 12: ...ment quality Local assistance with service problems The following is a list of retrofit options and accessories to further simplify maintenance access Internal Service Platform Ladder with Handrails E...

Отзывы: