
ii
TABLE OF CONTENTS
SECTION 1 - GAME OPERATION & TEST INFORMATION
....................................................…… 1-1
Raising the Playfield....................
..................................................................................… 1-9
Game Control Locations………………………………………………………………………... 1-10
Game Operation…………………………………………………………………………………. 1-11
Menu System Operation and System Menu...................................................................... 1-12
Switch Edges Test.............................................................
............................… 1-13
Single Switch Test....................................................................................…..... 1-13
DIP Switch Test....................................................................................……...... 1-13
Solenoid Test..........................................................................................……… 1-14
Single Lamp Test..........................................................................................…. 1-14
Lamp Row/
Column Test................................................................................… 1-14
All Lamps Test……………………………………………………………………….. 1-14
Video Test……………………………………………………………………………. 1-14
Fuse Check…………………………………………………………………………... 1-14
Audio Adjustments…………………………………………………………………... 1-15
System Adjustments………………………………………………………………… 1-16
Feature Adjustments…….………………………………………………………….. 1-17
Game Pricing……………..…………………………………………………………. 1-20
High Scores………………………………………………………………………….. 1-20
its……………...................................................................................... 1-21
Earning Audits……………………………………………………………………….. 1-21
Standard Audits………...................................................................................... 1-23
Feature Audits……………………………………………………………………….. 1-23
Histograms....................................................................................…………….. 1-26
Time Stamps…………………………………………………………………………. 1-26
Earnings Charts……………………………………………………………………… 1-26
.......................................................................................... 1-27
Update Game Code.......................................................................................... 1-28
Clear Audits....................................................................................……………. 1-28
Clear Coins................................
............................................................………. 1-28
Reset High Scores...................................................................................…….. 1-28
Set Clock.............................................................
..............................………….. 1-28
Factory Adjustments......................................................................…………….. 1-28
Factory Reset......................................................................……………………. 1-28
Insta
ll Presets...........................................................……………………………. 1-28
Clear Credits......................................................................……………………... 1-29
Copyright 1999 Williams Electronics Games, Inc.
Содержание Revenge from mars Pinbal 2000
Страница 3: ......
Страница 4: ......
Страница 11: ......
Страница 12: ......
Страница 49: ......
Страница 50: ......
Страница 56: ...2 6 04 12329 Power Driver Board...
Страница 79: ...2 29 04 10346 1 Tilt Mechanism Assembly 04 10346 TILT MECHANISM ASSY 20 6502 A PLUMB BOB 20 10289 FASTENER...
Страница 92: ...2 42 50070 PL Playfield Switch Locations START LAUNCH...
Страница 94: ...2 44 50070 PL Solenoid Flasher Locations...
Страница 99: ......
Страница 100: ......
Страница 105: ...3 5 SWITCH MATRIX CIRCUIT COIN SLOT SWITCH CIRCUIT DIAGNOSTIC SWITCH CIRCUIT...
Страница 106: ...3 6 PLAYFIELD FLIPPER SWITCH E O S CIRCUIT CABINET FLIPPER SWITCH CIRCUIT...
Страница 108: ...3 8 SOLENOID WIRING COILS...
Страница 109: ...3 9 FLASHLAMPS...
Страница 110: ...3 10 CIRCUIT for SOLENOIDS 1 to 16 CIRCUIT for SOLENOIDS 17 to 28...
Страница 111: ...3 11 FLIPPER COIL CIRCUIT...
Страница 112: ...3 12 UPPER AND LOWER RIGHT FLIPPER CIRCUITS...
Страница 113: ...3 13 UPPER AND LOWER LEFT FLIPPER CIRCUITS...
Страница 116: ...3 16 10 Opto Switch Board Schematic A 18159 1...
Страница 124: ...3 24 Coin Door Interface Board Schematic 04 12492...
Страница 129: ...3 29 NOTES...