background image

Reader Comment Form

CineVision™ Installation and Maintenance

viii

MK2A-CINEV-0001 [B]

C

o

p

yrigh

2006 B

al

ly G

amin

g, I

n

c. Al

l Ri

gh

ts 

R

es

er

ved.

Содержание CineVision MK2A-CINEV-0001

Страница 1: ...6601 S Bermuda Rd Las Vegas NV 89119 z 1 877 GO BALLY z www ballytech com CineVision Installation and Maintenance MK2A CINEV 0001 B...

Страница 2: ...ion contains confidential and proprietary information of Bally Gaming Inc No portion of this document may be reproduced or transmitted in any form or by any means electronic or mechanical for any purp...

Страница 3: ...1 3 Flammable Weights 1 4 Dimensions 1 4 Required Parts 1 5 Lock and Cam Specification 1 5 Required Tools 1 5 Installation Checklist 1 6 Pre Installation Steps 1 6 Installation Steps 1 6 Chapter 2 Ins...

Страница 4: ...Buttons 4 4 All Glass 4 4 Door Switch Optic emitter 4 4 Coin Entry 4 5 Coin Acceptor 4 5 COD Board Optics 4 5 Coin Diverter Inspection 4 5 Coin Hopper 4 6 Coin Switch 4 6 Hopper Test 4 6 Coin Bowl and...

Страница 5: ...EV 0001 B v Copyright 2006 Bally Gaming Inc All Rights Reserved Printer 4 12 EPROM or EEPROM Flash Upgrade 4 12 Ribbon Impact 4 12 Print Head 4 12 Main Processing Unit MPU 4 13 EPROM or CompactFlash 4...

Страница 6: ...Contents CineVision Installation and Maintenance vi MK2A CINEV 0001 B Copyright 2006 Bally Gaming Inc All Rights Reserved...

Страница 7: ...on Circle one Table of Contents Index How clear concise and easy to follow are the procedures ___________________________________ How could these procedures be easier to follow _______________________...

Страница 8: ...Reader Comment Form CineVision Installation and Maintenance viii MK2A CINEV 0001 B Copyright 2006 Bally Gaming Inc All Rights Reserved...

Страница 9: ...ision Installation and Maintenance Copyright 2006 Bally Gaming Inc All Rights Reserved Chapter 1 Overview This section includes the following topics Installation Requirements Required Parts Required T...

Страница 10: ...MK2A CINEV 0001 B Copyright 2006 Bally Gaming Inc All Rights Reserved Installation Requirements This document applies to the CineVision cabinet CineVision Specifications Digital Image The following fi...

Страница 11: ...506 Mechanical Specifications Weight 345 Pounds 156 82 Kg uncrated Dimensions Height without Tower Light The two tier tower light is approximately 5 and 1 2 inches 68 42 Inches 173 79 cm Width 28 06...

Страница 12: ...ys the overall dimensions of the CineVision Figure 2 Overall Dimension Flammable Weights for CineVision Item Description Flammable Weight Pounds Kilograms Bezel Arm Rests Coin Chute and Miscellaneous...

Страница 13: ...ation in each machine cabinet before installing machines Single or dual lock configurations are possible All lock openings are 5 8 inch 1 59 cm by 3 4 inch 1 91 cm The locks are 90 degree rotations Lo...

Страница 14: ...tion Steps Complete the following steps before installing the machine Purchase assemble and install power and network cabling for the desired floor plan Purchase and receive locks Installation Steps C...

Страница 15: ...ng Inc All Rights Reserved Chapter 2 Installation Installation Instructions This section includes the following installation instructions Unpacking and Inspecting the Machine Installing the Machine In...

Страница 16: ...nterior cables and ensure they are firmly connected STEP 8 Inspect the circuit board assemblies and CompactFlash for loose connections and ensure they are firmly attached See Reseating Operating Syste...

Страница 17: ...for the top box matches the desired software for the game Install the glass in the top box STEP 3 Move the machine to the desired location using a lifting and moving device such as a hand truck STEP 4...

Страница 18: ...if your cabinet contains locks used for shipping purposes only then order locks from a reliable lock supplier See CineVision Assemblies Parts and Hardware in the CineVision Operator s Instruction Manu...

Страница 19: ...rating System OS and Game Software Use the following instructions to reseat loose CompactFlash cards STEP 1 Locate and open the logic door Figure 2 CineVision Logic Door Location STEP 2 Reseat the OS...

Страница 20: ...sion Power Switch Locations STEP 3 If the Operating System CompactFlash has not been installed then insert the Operating System CompactFlash in the top socket STEP 4 If the Game CompactFlash has not b...

Страница 21: ...g and remove the power and network cables STEP 6 Place the machine at the desired location Do not place the machine on any wires or cables STEP 7 To remove the machine from service stop here To reloca...

Страница 22: ...d Maintenance 3 2 MK2A CINEV 0001 B Relocate a Machine Copyright 2006 Bally Gaming Inc All Rights Reserved STEP 12 Press the cabinet power switch to supply power to the cabinet components STEP 13 Flip...

Страница 23: ...Chapter 4 Periodic Maintenance This section provides periodic maintenance information for all machine models and the following components Cabinet Machine Door Coin Entry Coin Hopper Bill Acceptor Hand...

Страница 24: ...d Key Switches X Machine Door Player Panel Buttons X All Glass X Door Switch Optic emitter X Coin Entry Coin Acceptor X COD Board Optics X Coin Diverter Inspection X Coin Hopper Coin Switch X Hopper T...

Страница 25: ...the cabinet to the stand Inspect the power cord for signs of overheating Lamps Replace any burned out lamps Faulty starters may cause flickering fluorescents All fluorescents illuminate when switchin...

Страница 26: ...tons Use a dry lint free cloth to clean the buttons If a cleaning solution is necessary use a mild glass cleaner Avoid abrasive cleansers All Glass Use a dry lint free cloth to remove the dust from th...

Страница 27: ...ect connections for frayed or broken wires COD Board Optics The Coin Optic Decoder Board uses an infrared emitter and detector to monitor coins The emitter and detector are on the same side of the COD...

Страница 28: ...l switches to count coins from the hopper Use a dry lint free cloth to clean the lenses Check the adjustment of the micro switch on slant machines Hopper Test Activate the Hopper Test as described in...

Страница 29: ...for the changing currency Replace if necessary Bill Path Open the acceptor and transport components Use a dry lint free cloth to remove any debris Timing Belts Replace frayed or worn belts Sensor Rep...

Страница 30: ...ptic sensor a release solenoid and an arm assembly Inspect the handle mechanism for proper function and to ensure handle arm is secure Press the pseudo coin button to energize the handle release solen...

Страница 31: ...ing instructions to maintain the reel drive components Reel Optics Optical sensors monitor the reel positions Clean the reel optics with a dry lint free cloth or swab Dirty reel optics can cause reel...

Страница 32: ...uter screens Position Color and Size For a CRT allow at least 20 minutes with power on for the monitor to stabilize Check the picture for discoloration or fade out Degauss if necessary Check for corre...

Страница 33: ...l lens cleaner can help maintain optimum performance from the 5 and inch optical disc drive The cleaner is a disc with a small lab grade brush installed on the underside that gently cleans the delicat...

Страница 34: ...ibbon Impact Frayed and worn ribbons can damage the print head by snagging and bending the pins Replace worn ribbons Print Head After opening the unit the ticket path is accessible for cleaning or cle...

Страница 35: ...dule MK2A CINEV 0001 B 4 13 Copyright 2006 Bally Gaming Inc All Rights Reserved Main Processing Unit MPU Use the following instructions to maintain the MPU components EPROM or CompactFlash Verify the...

Страница 36: ...Chapter 4 Periodic Maintenance CineVision Installation and Maintenance 4 14 MK2A CINEV 0001 B Periodic Maintenance Schedule Copyright 2006 Bally Gaming Inc All Rights Reserved...

Страница 37: ...g Inc All Rights Reserved Chapter 5 Spare Parts Ordering Spare Parts To order replacement parts and spare parts see your CineVision Assemblies Parts and Hardware guide Parts and manuals can be ordered...

Страница 38: ...Chapter 5 Spare Parts CineVision Installation and Maintenance 5 2 MK2A CINEV 0001 B Ordering Spare Parts Copyright 2006 Bally Gaming Inc All Rights Reserved...

Страница 39: ...er switch 3 1 cables 2 2 cam lock and cam specification 1 5 category 5 network cables 1 5 3 1 CD ROM drive component maintenance 4 11 checklist 1 6 circuit board assemblies 2 2 coin entry component ma...

Страница 40: ...ain processor unit 2 4 maintenance 4 2 bill acceptor components 4 7 cabinet components door switch optic 4 3 CD ROM drive components 4 11 coin entry components 4 5 coin hopper components 4 6 handle me...

Страница 41: ...ing system and game software cards 2 5 Return Merchandise Authorization RMA 2 2 S scratches 2 2 serial numbers 2 2 service interval 4 2 shipping damage 2 2 shipping documents 2 2 single lock configura...

Страница 42: ...Index CineVision Installation and Maintenance IX 4 MK2A CINEV 0001 B Copyright 2006 Bally Gaming Inc All Rights Reserved...

Отзывы: