Figure 32: Front Base Panel

Figure 33:  Lock Hardware

Front Base Panel

STEP 1:

Slide the bottom edge of the panel into the

cabinet.

STEP 2:

Lift the top portion of the panel to close.

STEP 3:

Turn the key to lock the panel in place.

STEP 4:

Leave the key in the lock.

Figure 34:  Front Base Panel

Top Box Assembly

This portion of the assembly involves the assembly and installation of the top box, which includes the

following:

Содержание CineVision 103126

Страница 1: ...CineVision Game Assembly CineVision Game Assembly DOC 103500 Assemblies 103126 105502 104217...

Страница 2: ...mation of Bally Gaming Inc No portion of this document may be reproduced or transmitted in any form or by any means electronic or mechanical for any purpose without the express written permission of B...

Страница 3: ...CineVision Game Assembly Technical Publications Las Vegas Nevada DOC 103500 Publication Date February 25 2011 VERSION 01 Page iii of 34 Visit our website at http www ballygaming com...

Страница 4: ...mblies 8 Speakers 10 Cable Interconnect Brackets 11 Door Switches 12 Base Shelf 13 Main Cabinet Door Lock 13 Catch Bottle and Tubing 14 Footrest 14 Processor Power Supply Assembly 15 4 Meter PCB 20 Au...

Страница 5: ...CineVision Game Assembly Technical Publications Las Vegas Nevada DOC 103500 Publication Date February 25 2011 VERSION 01 Page v of 34...

Страница 6: ...CineVision cabinet are preassembled and installed prior to reaching Bally s assembly line Remaining portions of the assembly require the contents of 103126 Cabinet Parts Kit 105502 Cabinet Base Assemb...

Страница 7: ...Game Assembly Technical Publications Las Vegas Nevada DOC 103500 Publication Date February 25 2011 VERSION 01 Page 7 of 34 Phillips Screwdriver 11 32 3 8 5 16 nut drivers Side Cutters Cable Ties p n E...

Страница 8: ...Screen 14 Gas Struts Parts and Assemblies Verify you have the parts and assemblies included in the Cabinet Parts Kit 103126 as listed in Table 3 Table 3 103126 Contents Reference Part Number Descripti...

Страница 9: ...er Supply 1 Figure 16 103107 24v Power Supply 1 Figure 18 44603 MPU Assembly 1 Figure 19 SDG 26460 4 4 Meter PCB 1 Figure 21 SDG 41060 Audio Board Tray 1 Figure 22 SDG 41061 Audio Board Chassis 1 Figu...

Страница 10: ...4212 on top of the upper portion of the cabinet a Be sure the terminals on each speaker point to the center of the cabinet as shown in Figure 2 STEP 2 St the Speaker Grill 103205 onto the four studs s...

Страница 11: ...e 3 6 Speaker Assembly Cable Interconnect Brackets STEP 1 Use two nuts NLS M0470 1117 to mount the left Cable Interconnect Bracket 101892 in the designated opening in the upper portion of the cabinet...

Страница 12: ...ate February 25 2011 VERSION 01 Page 12 of 34 Figure 4 Cable Interconnect Brackets Door Switches STEP 1 Locate each of the three door switch brackets numbered in Figure 6 STEP 2 Insert a Door Switch E...

Страница 13: ...ighten the thumb bolts to secure the shelf to the base of the cabinet Figure 7 Installed Base Shelf Main Cabinet Door Lock STEP 1 If necessary disassemble the Lock M 00281 0170 and set hardware aside...

Страница 14: ...ttle 104798 in the back of the cabinet base on the right and left STEP 3 If necessary cut the Water Diversion Tubing 104799 to create two 6 pieces STEP 4 Place one end of each 6 tube onto the stand of...

Страница 15: ...Assembly STEP 1 Use four nuts NLS M0470 1117 to mount the processor power supply 103470 onto four studs numbered in Figure 14 in the lower portion of the cabinet a Be sure the backplane rests securel...

Страница 16: ...CineVision Game Assembly Technical Publications Las Vegas Nevada DOC 103500 Publication Date February 25 2011 VERSION 01 Page 16 of 34...

Страница 17: ...the MPU power supply assembly STEP 3 Slide the 24v Power Supply 103107 onto the right side of MPU power supply assembly STEP 4 Tighten the thumb bolts on each power supply to secure in place Figure 1...

Страница 18: ...the following chart and Figure 18 and connect the MPU cables accordingly Ref Figure 18 Cable 1 Touch Screen E 00664 0710 2 VGA E 00664 0708 3 MPU Power E 126 184 4 Audio Line Out Figure 18 MPU Cable C...

Страница 19: ...CineVision Game Assembly Technical Publications Las Vegas Nevada DOC 103500 Publication Date February 25 2011 VERSION 01 Page 19 of 34 S...

Страница 20: ...f 34 4 Meter PCB STEP 1 Use four screws LSPP M0350 1206 to mount the 4 Meter PCB SDG 26460 4 to the Figure 19 SDG 26460 4 Figure 20 SDG 26460 4 Mount Location Audio Board Tray Chassis STEP 1 Use four...

Страница 21: ...dio Board Tray and Chassis Figure 22 Chassis Mount Location STEP 2 Slide the Audio Board Tray SDG 41060 into the chassis STEP 3 Tighten the thumb bolt to secure the tray in place Figure 23 Audio Board...

Страница 22: ...ead Mount Location Figure 26 Mounted Deck Bulkhead STEP 3 Locate the Cabinet Harness 104225 connected to the MPU power supply assembly STEP 4 Insert the following connectors into deck bulkhead precise...

Страница 23: ...D Touch Screen 103694 onto the two studs located on the right and left side of the touch screen area circled in Figure 28 STEP 2 Tighten a nut NLS M0470 1117 onto each stud 4 total to secure the touch...

Страница 24: ...Grill Assembly STEP 5 Locate the monitor rail posts each corner of the touch screen see Figure 28 and Figure 30 STEP 6 Place an assembled side grill on each of the bottom rail posts IMPORTANT Notice...

Страница 25: ...CineVision Game Assembly Technical Publications Las Vegas Nevada DOC 103500 Publication Date February 25 2011 VERSION 01 Page 25 of 34 Figure 30 Installing the Side Grills Gas Struts...

Страница 26: ...k and Cam 3 Front Base Panel Parts and Assemblies Verify you have the parts and assemblies included in the Cabinet Base Assembly p n 105502 as listed in Table 4 Table 4 105502 Contents Reference Part...

Страница 27: ...necessary disassemble the Lock M 00281 0170 and set hardware aside STEP 2 Press the lock into the designated hole in the Front Base Panel 103462 as in Figure 32 STEP 3 Place the Cam SDG 20228 onto th...

Страница 28: ...ck Hardware Front Base Panel STEP 1 Slide the bottom edge of the panel into the cabinet STEP 2 Lift the top portion of the panel to close STEP 3 Turn the key to lock the panel in place STEP 4 Leave th...

Страница 29: ...on Quantity 103686 Arch Top Enclosure Top Box Cabinet 1 SDG 30294 24V Dual Fluorescent Lamp Assembly 1 103706 Top Box Door 1 104743 Candle Mount 1 105583 Candle Mount Gasket 1 103708 Lower Glass Clamp...

Страница 30: ...uary 25 2011 VERSION 01 Page 30 of 34 Top Box Cabinet STEP 1 Lay the Top Box Cabinet 103686 on a flat surface with the front side facing up STEP 2 Use two nuts NLS M0470 1117 to mount the 24V Dual Flu...

Страница 31: ...da DOC 103500 Publication Date February 25 2011 VERSION 01 Page 31 of 34 Door Switch STEP 1 Locate the door switch bracket on the right side of the top box cabinet STEP 2 Insert the provided Door Swit...

Страница 32: ...e doorframe STEP 4 With the gasket side firmly against the glass set the Lower Glass Clamp 103708 onto the three studs inside the doorframe STEP 5 Use three nuts NLS M0470 1117 to secure the glass in...

Страница 33: ...disassemble the top box Lock M 00281 0167 Figure 38 Lock Hardware STEP 2 Insert the lock into the designated hole on the top of the top box cabinet STEP 3 From the inside of the cabinet place the Cam...

Страница 34: ...CineVision Game Assembly Technical Publications Las Vegas Nevada DOC 103500 Publication Date February 25 2011 VERSION 01 Page 34 of 34 Figure 39 Installing the Lock and Cam...

Отзывы: