4 General Information

MN427

c. If a zipper

closing type bag is used instead of the heat

sealed type bag, zip the bag closed

instead of taping it. Be sure to place new desiccant inside bag after each monthly inspection.

d. Place the shell over the motor and secure with lag bolts.

4. Where motors are mounted to machinery, the mounting must be such that the drains and breathers

are fully operable and are at the lowest point of the motor. Vertical motors must be stored in the

vertical position.   Storage environment must be maintained as stated in step 2.

5. Cooling Tower Motors have anti

friction bearings that are fully greased at the time of shipment from

the factory and suitable for going into extended storage with periodic service as follows:

a. Motors marked “Do Not Lubricate” on the nameplate do not need to be greased before or during

storage.

b. Ball bearing (anti

friction) motor shafts are to be rotated manually every six months and greased

in accordance with the Maintenance section of this manual.

6. All breather drains are to be fully operable while in storage (drain plugs removed). The motors must

be stored so that the drain is at the lowest point. All breathers and automatic “T” drains must be

operable to allow breathing and draining at points other than through the bearings around the shaft. 

Vertical motors should be stored in a safe stable vertical position.

7. Coat all external machined surfaces with a rust preventing material. 

An acceptable product for this purpose is Exxon Rust Ban # 392.

Removal From Storage

1. Remove all packing material.

2. Measure and record the electrical resistance of the winding insulation resistance meter at the time of

removal from storage.  The insulation resistance must not be less than 50% from the initial reading

recorded when the motor was placed into storage.  A decrease in resistance indicates moisture in the

windings and necessitates electrical or mechanical drying before the motor can be placed into

service. If resistance is low, contact your Baldor District office.

3. Regrease the bearings as instructed in Section 3 of this manual.

4. Reinstall the original shipping brace if motor is to be moved.  This will hold the shaft firmly against the

bearing and prevent damage during movement.

This Manual:http://www.manuallib.com/baldor/mn427-inverter-duty-pm-motors-manual.html

Содержание MN427

Страница 1: ...Not Proceed Please contact your Baldor District office for more information or clarification Before you install operate or perform maintenance become familiar with the following if applicable to your...

Страница 2: ...s FL250 FL280 FL440 and FL580 Specifically designed for operation with VS1CTD Adjustable Speed Cooling Tower Controls Installation Operating Manual 2 12 MN427 This Manual http www manuallib com baldor...

Страница 3: ...are the property of their respective owners Important Be sure to check www baldor com for the latest version of this manual in Adobe Acrobat PDF format This Manual http www manuallib com baldor mn427...

Страница 4: ...Grounding 2 4 Condensation Drain 2 4 Fan Mounting 2 4 Bearing Axial Thrust Limits 2 5 Optional Accessories 2 5 First Time Start Up and Operation 2 6 Air Flow Cooling 2 6 Maximum Safe Speed 2 6 Balanc...

Страница 5: ...Section 1 General Information ii Table of Contents MN427 This Manual http www manuallib com baldor mn427 inverter duty pm motors manual html...

Страница 6: ...shock can cause serious or fatal injury Only qualified personnel should attempt the installation operation and maintenance of this equipment WARNING Disconnect all electrical power from the motor win...

Страница 7: ...to a hazardous and or explosive atmosphere WARNING Guards must be installed for rotating parts such as couplings pulleys external fans and unused shaft extensions should be permanently guarded to pre...

Страница 8: ...ure leading to the motor winding failure A wooden crate shell should be constructed to secure the motor during storage This is similar to an export box but the sides top must be secured to the wooden...

Страница 9: ...storage drain plugs removed The motors must be stored so that the drain is at the lowest point All breathers and automatic T drains must be operable to allow breathing and draining at points other th...

Страница 10: ...the eye bolt or lifting lug Excessive lifting angles can cause damage After storage or after unpacking and inspection to see that all parts are in good condition do the following 1 Rotate the motor sh...

Страница 11: ...t causes permanent deformation of the motor feet 8 Secure the motor to the cooling tower structure with flange mounting bolts not provided 9 Tighten the flange mounting bolts to the proper torque spec...

Страница 12: ...ering hazardous voltages and that the voltage at the motor leads is zero before proceeding Failure to observe this precaution may result in severe bodily injury or death Caution Use only a shielded mo...

Страница 13: ...e drive ground In addition if the motor and coupled equipment are not on a single common metal base plate it is important to equalize the equipment ground potentials by bonding the motor frame to the...

Страница 14: ...ive has a trickle current heating feature For extreme applications that require space heaters one heater is installed in each end of motor Leads for each heater are labeled H1 H2 Like numbers should b...

Страница 15: ...Any undue noise overheating or erratic performance should be investigated and corrective action taken immediately to prevent serious damage All RPM AC motors are lubricated before shipment and will op...

Страница 16: ...General Inspection Inspect the motor at regular intervals approximately every 500 hours of operation or every 3 months whichever occurs first Keep the motor clean and the ventilation openings clear T...

Страница 17: ...16 0 5 14 17 500 FL280 SHC460 1 5 24 1 25 35 17 500 FL440 SHC460 5 48 2 5 70 17 500 FL5800 12 197 6 0 170 8 750 Klubersynth BH72 422 The relubrication interval is given in Table 3 1 or sooner unless o...

Страница 18: ...test and repair as required Improper connections Inspect all electrical connections for proper termination clearance mechanical strength and electrical continuity Refer to motor lead connection diagra...

Страница 19: ...uced so that an abnormal machine load will be identified The temperature limits are based on the installation of the winding RTDs imbedded in the winding as specified by NEMA Bearing RTDs should be in...

Страница 20: ...Baldor District Offices This Manual http www manuallib com baldor mn427 inverter duty pm motors manual html...

Страница 21: ...N427 All rights reserved Printed in USA 2 12 World Headquarters P O Box 2400 Fort Smith AR 72901 2400 479 646 4711 Fax 479 648 5792 www baldor com This Manual http www manuallib com baldor mn427 inver...

Отзывы: