Instruction Manual
ASDA
- 16
Figure 10
ASSEMBLING THE CRUSHING ROLL
13 -
Place the support (1) on the structure (2) with the plate (3), washer
and nut (4).
14 -
Place the sway bar (5) between the support (1) and lock it with the
pin (6), washer and lock (7).
15 -
Couple the crushing roll (8) to the sway bar (5)
with the screw (9), washer and nut (10).
16 -
Then, place the spring (11) between the sway
bar (5) and the support (1) using the pins (12),
washers and locks (13).
Содержание ASDA
Страница 1: ...Subsoiler Plow with Automatic Shank ASDA...
Страница 2: ......
Страница 4: ...Subsoiler Plow with Automatic Shank ASDA...
Страница 29: ...InstructionManual 27 ASDA LUBRICATION POINTS Figure21 Lubricate every 10 hours...
Страница 30: ...InstructionManual ASDA 28 LUBRICATION POINTS Lubricate every 60 hours Lubricate every 100 hours Figures22...
Страница 35: ...InstructionManual 33 ASDA NOTE...
Страница 38: ......
Страница 40: ......
Страница 42: ......
Страница 45: ......
Страница 46: ...InstructionManual ASDA 4...