background image

 

 

Baker M6 DeDuster - Rev 1, 11/07

WWW.BAKER-ONLINE.COM

 

Control of Hazardous Energy – (Lockout / Tagout) 

Lockout / Tagout (LOTO) refers to specific practices and procedures to safeguard employees 
from the unexpected energy, startup of machinery/equipment, or the release of hazardous 
energy during service or maintenance activities.  
 
This requires that a designated individual turn off and disconnect the machinery/equipment 
from its energy source(s) before performing service or maintenance and that the authorized 
employee(s) lock and tag the energy-isolating device(s) to prevent the release of hazardous 
energy and take steps to verify that the energy has been isolated effectively. 

 

 

List of Related Terms 

Affected 
Employee 

An employee whose job requires them to operate a machine or piece of 
equipment on which service or maintenance is being performed.

 

Authorized 
Employee 

A person who locks or implements a tagout system procedure on machines 
or equipment to perform service or maintenance on that machine or 
equipment. An authorized employee and an affected employee may be the 
same person when the affected employee's duties also include performing 
service or maintenance.  

 

Energy 
Source 

Any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal, 
or other energy.

 

Lockout 

The placement of a lockout device (such as a lock) on an energy-isolating 
device, in accordance with an established procedure that ensures the device 
and the equipment cannot be operated until the lockout device is removed.  

Servicing 
and / or 
Maintenance 

Workplace activities such as constructing, installing, setting up, adjusting, 
inspecting, modifying, maintaining or servicing machines or equipment. 
These activities include lubrication, cleaning or un-jamming of machines or 
equipment, and making adjustments or tool changes where the employee 
may be exposed to the unexpected energy, start-up of equipment or release 
of hazardous energy. 

Tagout 

The placement of a tagout device (such as a tag) on an energy-isolating 
device, in accordance with an established procedure that ensures the device 
and the equipment may not be operated until the tagout device is removed.   

 
 

 

The Fatal Five Main Causes of 

Lockout/Tagout Injuries 

1.  Failure to stop equipment 
2.  Failure to disconnect from a power 

source 

3.  Failure to dissipate (bleed, neutralize) 

residual energy 

4.  Accidental re-starting of equipment 
5.  Failure to clear work areas before re-

starting 

 

Example of lockout tags, 

lockout hasp and keyed lock 

Содержание DeDuster M6

Страница 1: ...er r D De eD Du us st te er r U Us se er r M Ma an nu ua al l Ellington Industrial Supply Inc P O Box 128 Ellington Missouri 63638 USA Web site www baker online com E mail info baker online com Phone...

Страница 2: ...out 9 Machine Safety Decals 10 3 MACHINE FEATURES 11 4 SET UP 12 Receiving and Inspection 12 Unpacking 12 Machine Positioning 12 Power and Utilities Requirements 12 Operator Training 13 5 OPERATION 14...

Страница 3: ...constantly review and refer back to it as necessary No one should attempt to operate or perform maintenance on this equipment until they have taken the time to read and understand the information cont...

Страница 4: ...where the work piece stringer board etc enters Lift Point A point where pressure can and should be applied for lifting Linear Foot A system of measurement in which only the length of the lumber is con...

Страница 5: ...r use of this machine take precedence over the statements in this manual Users of this machine must adhere to such regulations Machine Specifications and Requirements Power Three 1 HP 75 kw TEFC Motor...

Страница 6: ...ch are considered a wearable and consumable item Ellington Industrial Supply Inc does not warranty this machine to meet any other requirements or jurisdiction of any electrical or safety codes of any...

Страница 7: ...pply Inc be liable for special indirect incidental or consequential damages however arising including but not limited to the loss of earnings or the cost of downtime Service Policy In the event that y...

Страница 8: ...T IN MOVING PARTS ALWAYS WEAR SAFETY GLASSES AND HEARING PROTECTION AVOID KICK BACK BY KNOWING WHAT CONDITIONS CAN CREATE IT CHECK DAMAGED PARTS AND REPAIR OR REPLACE THEM IMMEDIATELY NEVER LEAVE MACH...

Страница 9: ...de performing service or maintenance Energy Source Any source of electrical mechanical hydraulic pneumatic chemical thermal or other energy Lockout The placement of a lockout device such as a lock on...

Страница 10: ...Baker M6 DeDuster Rev 1 11 07 WWW BAKER ONLINE COM 10 Machine Safety Decals Adhere to ALL Safety Warnings...

Страница 11: ...er DeDuster Heavy duty steel construction Powerful electric motors Air driven material pusher Easy to set up and fast feed speed Baker M6 Sidewinder DeDuster Heavy duty steel construction Heavy duty n...

Страница 12: ...nd dry free of environmental elements such as rain or snow that could cause electrical or slip hazards We recommend you anchor the machine to the floor with the bolts in the footpads Provide a minimum...

Страница 13: ...Be sure personnel are properly trained and safety rules are clearly understood before operating or performing maintenance Operator Machine Guards Devices Instructions F FR RE EE E T TR RA AI IN NI IN...

Страница 14: ...s aware that the machine is in operation It is the operator s responsibilities to ensure these safety conditions exist Descriptions All Stop Button designed to immediately shutdown machine operation B...

Страница 15: ...opening 1 4 greater than width of material being processed Re tighten the pivot bolt and nut and adjustment bolt and nut To set material length loosen the 3 bolts and nuts that secure the end stop and...

Страница 16: ...ft secures the top and bottom spiral brushes in their proper position To adjust the height of the bottom brush loosen the jam nuts on each side Figures 16B 16C and raise or lower the bottom brush heig...

Страница 17: ...es 17 17A Raise or lower the top brush height by turning the adjustment bolt Note Ideal de duster brush height is when the very tip of the brushes comes in full contact with both the top and bottom of...

Страница 18: ...sh the BRUSH START button to start the de dusting brushes spinning Wait until the motor starts and is running at full speed then push the FEED START button to start the feed conveyor and material tran...

Страница 19: ...ng personal protective equipment for handling materials Using proper procedure for disposing of all waste materials Inspection and Preventative Maintenance Checklist Frequency Recommendation Daily App...

Страница 20: ...t with no more than a 1 2 of play in the tension of the chains Figure 20B 20C Belt tension should be taut with no more than of deflection Increase or decrease tension here Increase or decrease belt te...

Страница 21: ...than 3 pumps EVERY 3 MONTHS Grease bearings using high temperature grease We recommend JT 6 grease no more than 5 pumps Lubricate linear rail bearing here 2 per side 4 total Lubricate linear rail bea...

Страница 22: ...ce with a new brush and re attach the trantorque bushing Slide the bottom brush out and remove the old brush and replace with a new brush Slide the new bottom brush into place and secure it to the gea...

Страница 23: ...Baker M6 DeDuster Rev 1 11 07 WWW BAKER ONLINE COM 23 Air Assembly Operate at 45 psi 1 2 incoming air supply connection 1 2 120 psi incoming air supply required Figure 23 Figure 23A...

Страница 24: ...ch cover With the hatch cover removed you can clean around the brushes or remove jammed material When done performing a task in or around the de duster chamber return the hatch cover to its proper pos...

Страница 25: ...1 4 Bearing 2 bolt flange 5 8 bolt hole 171035 2 piece locking collar 1 251105 Bushing trantorque 1 1 4 long 251111 Bushing trantorque 1 short 241148 1 4 air muffler 242007 1 4 air quick plug 241020...

Страница 26: ...1 131111 Sprocket 6024 x 1 1 4 133420 Sprocket 60B15 x 5 8 idler 133422 Sprocket 60A24 111020 Belting 5 1 2 slick top 3 8 thick 151252 Electric twist release e kill button 151250 Electric recessed pu...

Страница 27: ...at 573 663 7711 any time between 8 00 AM and 5 00 PM CST Monday through Friday Serial Number Location The model and serial number are located on the front side of the machine near the material entry...

Отзывы: