background image

6  |  BHGE

© 2018 Baker Hughes, a GE company. All rights reserved.

V. Terminology for Safety Relief Valves

• 

Accumulation: The pressure increase over the maximum 

allowable working pressure of the vessel during discharge 
through the  POSRV,  expressed  as  a  percentage  of that 
pressure or in actual pressure units.

• 

Backpressure: The pressure on the discharge side of the 

POSRV:

 

ƒ

Built-up Backpressure: Pressure that develops at the 

valve outlet as a result of flow, after the POSRV has 
been opened.

 

ƒ

Superimposed  Backpressure:  Pressure  in  the 

discharge header before the POSRV opens.

 

ƒ

Constant  Backpressure:  Superimposed  backpressure 
that is constant with time.

 

ƒ

Variable  Backpressure:  Superimposed  backpressure 

that will vary with time. 

• 

Blowdown:  The  difference  between  set  pressure  and 

reseating  pressure  of  the  POSRV,  expressed  as  a 
percentage of the set pressure or in actual pressure units.

• 

Cold Differential Set Pressure: The pressure at which the 

valve is adjusted to open on the test stand. This pressure 
corrects for backpressure when a pop action pilot’s vent 
is piped to the main valve outlet.

• 

Differential  Between  Operating  and  Set  Pressures: 

Valves in process service will generally give best results 
if the operating pressure does not exceed 90% of the set 
pressure. However, on pump and compressor discharge 
lines,  the  differential  required  between  the  operating 
and  set  pressures  may  be  greater  because  of  pressure 
pulsations coming from a reciprocating piston. The valve 
should  be  set  as  far  above  the  operating  pressure  as 
possible.

• 

Lift: The  actual travel  of the  disc  away from the  closed 

position when a valve is relieving.

• 

Maximum  Allowable  Working  Pressure:  The  maximum 

gauge pressure permissible in a vessel at a designated 
temperature.  A vessel  may  not  be  operated  above this 
pressure  or  its  equivalent  at  any  metal  temperature 
other than that used in its design. Consequently, for that 
metal  temperature,  it  is  the  highest  pressure  at  which 
the primary pressure POSRV is set to open.

• 

Operating  Pressure:  The  gauge  pressure  to  which  the 

vessel is normally subjected in service. A suitable margin 
is  provided  between  operating  pressure  and  maximum 

allowable working pressure. For assured safe operation, 
the operating pressure should be at least 10% under the 
maximum  allowable  working  pressure  or  5  psig  (0.34 
bar), whichever is greater.

• 

Overpressure: A pressure increase over the set pressure 

of the  primary  relieving  device.  Overpressure  is  similar 
to accumulation when the relieving device is set at the 
maximum  allowable  working  pressure  of  the  vessel. 
Normally, overpressure is expressed as a percentage of 
set pressure.

• 

Pilot  Operated  Safety  Relief  Valve  (POSRV):  A  pressure 

relief  valve  in  which  the  major  relieving  device  is 
combined  with,  and  is  controlled  by,  a  self-actuated 
auxiliary pressure relief valve.

• 

Rated  Capacity:  The  percentage  of  measured  flow  at 

an  authorized  percent  overpressure  permitted  by  the 
applicable code. Rated capacity is generally expressed in 
pounds per hour (lb/hr) or kilograms per hour (kg/hr) for 
vapors, standard cubic feet per minute (SCFM) or cubic 
meters per minute (m

3

/min) for gases, and in gallons per 

minute (GPM) or Liter/min (L/min) for liquids.

• 

Relief  Valve:  An  automatic  pressure-relieving  device, 

actuated by static pressure upstream from the valve. A 
relief valve is used primarily for liquid service.

• 

Safety Relief Valve (SRV): An automatic pressure-relieving 

device used as either a safety or relief valve, depending 
upon application. The SRV is used to protect personnel 
and equipment by preventing excessive overpressure.

• 

Safety  Valve:  An  automatic  pressure-relieving  device 

actuated  by the  static  pressure  upstream  of the  valve, 
and characterized by a rapid opening or “pop” action. It is 
used for steam, gas, or vapor service.

• 

Set  Pressure: The  gauge  pressure  at the valve  inlet, for 

which the relief valve has been adjusted to open under 
service  conditions.  In  liquid  service,  the  inlet  pressure 
at  which  the  valve  starts  to  discharge  determines  set 
pressure.  In  gas  or  vapor  service,  the  inlet  pressure  at 
which the valve pops determines the set pressure.

Содержание 13900 Series

Страница 1: ...BHGE Data Classification Public Consolidated 13900 Series Pilot Operated Safety Relief Valve Maintenance Manual Rev B Maintenance Manual Rev B 09 2018...

Страница 2: ...ND THE PARTICULAR REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOTPURPORTTO COVERALL DETAILS ORVARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY...

Страница 3: ...assistance All the United States Customary System USCS values are converted to metric values using the following conversion factors USCS Unit Conversion Factor Metric Unit in 25 4 mm lb 0 4535924 kg i...

Страница 4: ...II Inspection and Part Replacement 17 XIV Reassembly of Pilot Valve 19 XV Disassembly of Main Valve 20 A Disassembly of Main Valve 20 B Main Valve Cleaning 21 XVI Inspection and Part Replacement Main...

Страница 5: ...necessary on how to avoid the hazard The top panel ofthe format contains a signal word DANGER WARNING CAUTION or ATTENTION which communicates the level of hazard seriousness The center panel contains...

Страница 6: ...ng or body parts Never use body parts to check for leakage or discharge rates of areas Pressurized fluids gas air injected into or near the body can cause severe personal injury or death 4 WARNING It...

Страница 7: ...improper use of right tools could result in personal injury or product or property damage 9 WARNING These WARNINGS are as complete as possible but not all inclusive BHGE cannot know all conceivable s...

Страница 8: ...ntact your local Green Tag Center if there are any questions relative to tools methods The installation and start up of valves and or valve products may involve proximity to fluids at extremely high p...

Страница 9: ...ion of our products Unauthorized Repair Work BHGE has not authorized any non BHGE affiliated repair companies contractors or individuals to perform warranty repair service on new products or field rep...

Страница 10: ...primary pressure POSRV is set to open Operating Pressure The gauge pressure to which the vessel is normally subjected in service A suitable margin is provided between operating pressure and maximum a...

Страница 11: ...fire resistant tear resistant envelope and stored in a weathertight and well ventilated building or equivalent enclosure Precautions shall betaken against vandalism This area shall be situated and con...

Страница 12: ...outlet An effort has been made to provide a valve which requires a minimum of maintenance upkeep and can be actually repaired on its installation site Factors which contribute to minimum maintenance r...

Страница 13: ...ce Manual 9 2018 Baker Hughes a GE company All rights reserved IX Consolidated 13900 Series POSRV 1 3 2 6 7 8 13 9 56 19 23 22 24 26 20 4 11 5 9 13 14 15 16 46 57 10 12 43a 43b 43a 12 44 45 21 18 17 F...

Страница 14: ...lt 27 Adjusting Ring Pin 28 Adjusting Ring 29 Pilot Bonnet Assembly 29a Bonnet 29b Guide 29c Pin 30 Bottom Spring Washer Ref No Nomenclature 31 Spindle Assembly 31a Spindle 31b Spindle Collar 32 Top S...

Страница 15: ...Manual 11 2018 Baker Hughes a GE company All rights reserved IX Consolidated 13900 Series POSRV Contd 37 36 38 40 34 39 35 33 29a 32 31 41 30 29c 29b 42d 42b 42a 42c 28 27 53 25 17a 21 20 17b 52 17c...

Страница 16: ...nular region formed by the sensing tube and pilot base Pressure in chamber C will now be designated P2 When the set pressure is reached and the pilot opens pressure is exhausted through tube D into th...

Страница 17: ...e main disc closing the main valve The backside of the main valve disc exposed to chamber C has a larger area than the main seat producing an additional force on the main seat to maintain tightness DR...

Страница 18: ...To prevent this from happening the discharge pipe should point downwind If this is not possible then a 900 elbow or a T should be installed CAUTION All discharge piping shall have sufficient area to...

Страница 19: ...24 3 21 9 17 5 15 4 Figure 6 Inlet Nut Torquing Sequence 1 Refer to table for torque valve for applicable round 2 Torque each nut in sequence shown 3 Repeat for each round Table 3 Outlet Nut Torque B...

Страница 20: ...r depth micrometer and record this information to restore compression during assembly Loosen the Locknut 34 and turn the Compression Screw 40 counterclockwise until compression is removed from spring...

Страница 21: ...off the old compound and apply more pressure to speed the cutting action of the compound 8 To check the seating surfaces remove all compound from both the seat and the lap Then shine up the seat with...

Страница 22: ...m Figure 9 Seat Step J F G H 028 0 71 mm M Disc Holder Retaining Ring Disc Collar Disc Figure 8 Disc Assembly Table 4 13900 Turbine Reheater Pilot Disc and Base Seat Dimensions Dimension in mm A 1 512...

Страница 23: ...lace a small amount of lubricant on the ball end of the Compression Screw 40 9 Holding the bonnet and spindle so that disc will not drop install the bonnet assembly to the pilot base Care should be ta...

Страница 24: ...e disc vertically out of body 7 Remove Guide RetainerTools 8 To remove the Main Guide 8 first remove the Upper Backing Ring 9 from the guide Using the tool shown in Figure 12b BHGE Part No 4128201 rot...

Страница 25: ...2 Whenever Main Valve Disc 7 is removed the Drilled Drain Plug 6 should be inspected and passages cleaned by the insertion of a wire of sufficient length 3 To replace the O Ring Seal Seal 11 or remov...

Страница 26: ...65 16 005 406 53 484 12 29 029 0 74 X X 150 450 C B Y A E RADIUS 150 FLAT WITHIN 002 0 05 mm T I R1 D D Figure 15 Main Valve Seat Bushing A Repair of Main Valve Seat If the seat bushing 2 seating surf...

Страница 27: ...mating surfaces inside the valve body inspected and cleaned All teflon seals O Rings and back up rings should be replaced and lubricated lightly with silicone lubricant All surfaces which will contac...

Страница 28: ...fter the disc is firmly installed 3 Install the Disc Spring Ring 57 and Spring 56 on the disc 4 Install a new Gasket 18 in the groove provided on the top of the guide 5 Using slings through the eyebol...

Страница 29: ...utlet of the main valve 7 Install the pilot flange Stud Nuts 45 and torque down evenly See Figure 19 and Table 7 for torquing values 8 Installthefittings onthe dischargetube Also install O Rings 12 on...

Страница 30: ...rew locknut c Adjust blowdown by removing adjusting ring pin and rotating adjusting ring clockwise decrease blowdown or counterclockwise increase blowdown until proper value is established Blowdown is...

Страница 31: ...ssure Gauge 4 300 101 60 7620 00 mm ANSI Rating Quick Opening Valve Fully Open During Test Drain Valve P2 Pressure Gauge Pilot Valve Pilot Test Fixture BHGE Tool Number 9500041 4 300 101 60 7620 00 mm...

Страница 32: ...ed by BHGE Care must be taken to prevent overgagging which will bend the spindle In applying gags remember that the valve spring will hold the valve closed against its set pressure The additional gag...

Страница 33: ...Fixture 4130901 4130901 4130901 4130901 1 Adjusting Ring Persuading Tool 4215501 4215501 4215501 4215501 2 Main Valve Guide RetainerTool 4215301 4215301 4215301 4215301 1 Lubricant1 5153301 5153301 5...

Страница 34: ...and determine those required for proper maintenance of the valve population in the plant D Identification and Ordering Essentials When ordering service parts please furnish the following information...

Страница 35: ...1 1 Sealing Wire 1 1 II Main Valve 85 Floating Washer 1 3 Floating Washer Retainer 1 3 Floating Washer Retainer Lock Ring 1 3 Pilot Valve If Alternate B used for Class I Guide 1 6 Guide Pin 1 6 Spindl...

Страница 36: ...k Screw 1 6 Release Nut 1 6 Release Lock Nut 1 6 Compression Screw Lock Nut 1 6 V Main Valve Not Applicable Base None Disc None Guide None Bonnet None Discharge Tube Assembly None Nameplate None Namep...

Страница 37: ...d factory maintains a Repair Center The Repair Department in conjunction with the manufacturing facilities is equipped to perform specialized repairs and product modifications e g butt welding bushing...

Страница 38: ...9 Melbourne Phone 61 3 8807 6002 Fax 61 3 8807 6577 BELGIUM Phone 32 2 344 0970 Fax 32 2 344 1123 BRAZIL Phone 55 19 2104 6900 CHINA Phone 86 10 5738 8888 Fax 86 10 5918 9707 FRANCE Courbevoie Phone 3...

Отзывы: