background image

read Before Servicing Equipment

The repair, calibration, and servicing of the warming unit 

requires the skill of a qualified medical equipment service 

technician who is familiar with good practice for medical 

device repair. If service is designated as not requiring 

manufacturer’s attention, the technical information is provided 

in this service manual or will be provided, on request, by 

Arizant Healthcare Inc. 

Refer to Service Manual 

Perform all repairs and maintenance in accordance with the 

instructions in this service manual.

Safety Inspection

Perform a safety inspection after making repairs to the  

Bair Hugger warming unit and before returning the warming 

unit to service. A safety inspection should include a test of the 

operating temperatures (described in this service manual), the 

Over Heat alarm system, as well as a leakage current test.

Proper Use and Maintenance

Arizant Healthcare Inc. assumes no responsibility for the 

reliability, performance, or safety of the equipment if:

•  Modifications or repairs are performed by non-authorized 

personnel.

•  The equipment is used in a manner other than that described 

in the Operator’s or Service Manuals.

•  The equipment is installed in an environment that does not 

meet the relevant grounding requirements.

Bair Hugger Model 505 Service Manual

4

Содержание Security Systems

Страница 1: ...izinische Technik weiterleiten Mise en garde Risque d lectrocution Certaines pi ces sont lectriquement charg es dans les appareils de r chauffement lorsque ceux ci sont connect s une source d alimenta...

Страница 2: ...Deutsch 29 Fran ais 61 English 1 Bair Hugger Model 505 Warming Unit Service Manual...

Страница 3: ...ard Fuse Replacement 7 Air Filter Replacement 9 Over Heat Alarm Testing 10 Over Heat Alarm Thermostat Adjustment 13 Normal Operating Temperature Testing 15 Normal Operating Temperature Adjustment 17 S...

Страница 4: ...odel 505 warming unit and includes maintenance instructions and specifications For information about using Bair Hugger blankets the 241 blood fluid warming set or Bair Paws gowns with Bair Hugger unit...

Страница 5: ...p indicator light illuminates and the alarm sounds Thermal injury may result Unplug the unit and contact a qualified service technician Do not continue 241 blood fluid warming therapy if the 6 over te...

Страница 6: ...tipping clamp the Temperature Management 5 Unit to an IV pole at a height that provides stability We recommend clamping the unit no higher than 44 112cm on an IV pole with a minimum 14 35cm radius wh...

Страница 7: ...on Perform a safety inspection after making repairs to the Bair Hugger warming unit and before returning the warming unit to service A safety inspection should include a test of the operating temperat...

Страница 8: ...and damage the components Also do not use alcohol or other solvents to clean the cabinet Solvents may damage the labels and other plastic parts Hose Replacement Method Press the tab on the blower outl...

Страница 9: ...iver to remove the fuse carrier from 4 the power entry module Remove the blown fuse s from the fuse carrier 5 Place the new fuse s as marked into the fuse carrier 6 CAUTION Replace only with the fuse...

Страница 10: ...ng up Using the Phillips head screwdriver remove the screw from 3 each of the 2 front feet bumpers and remove the feet Remove the Phillips head screw from the center of the 4 upper rear panel Remove t...

Страница 11: ...e all screws 9 NOTE It may be necessary to remove the air filter to correctly position the lower portion of the retainer bracket inside the unit Reconnect the warming unit to the power source 10 Recor...

Страница 12: ...The filter should slide out easily Record the hour meter reading and date on the new air 3 filter label The hour meter is located in the lower left corner of the top warning label see Figure 4 Slide...

Страница 13: ...designed to simulate the operating characteristics of Bair Hugger blankets and Bair Paws gowns when used with Bair Hugger warming units use of the temperature test device with any other warming syste...

Страница 14: ...not affect the Over Heat test Using the Phillips head screwdriver remove the screw on 3 the alarm test panel The unit will go into an over heat condition when the test panel is loose When the over he...

Страница 15: ...mits turn the warming unit to STANDBY and disconnect the warming unit from the power source Remove the hose end from the port on the temperature test 8 device Retighten the screw on the over heat alar...

Страница 16: ...be calibrated Follow the calibration instructions in the meter service manual or follow standard facility calibration schedules When in doubt contact Arizant Healthcare Technical Support for assistanc...

Страница 17: ...RCLOCKWISE to lower the alarm temperature Fine tune the adjustment until the warming unit alarms at 6 the specified temperature Manually turn the warming unit to STANDBY then 7 ON again This manual re...

Страница 18: ...to temperatures outside of the indicated range and may lead to patient injury Service Frequency 6 month intervals or 500 hours of use Tools Equipment Model 221 Temperature Test Kit or Model 22110 Temp...

Страница 19: ...its allow the warming unit to operate at each temperature setting for about 3 to 5 minutes before test Turn the warming unit to STANDBY Remove the hose 8 end from the port on the temperature test devi...

Страница 20: ...t kit at least once a year The Model 22110 Temperature Test Unit does not need to be calibrated The meter it is connected to must be calibrated Follow the calibration instructions in the meter service...

Страница 21: ...r COUNTERCLOCKWISE to lower the operating temperature Adjust the potentiometer until the temperature read out 4 meets the limits specified in Table 4 for the HIGH temperature setting correlated to amb...

Страница 22: ...end of the hose as determined by the Model 221 Temperature Test Kit or Model 22110 Temperature Test Unit Temperature Characteristics Air temperatures reaching the patient are approximately 2 C lower...

Страница 23: ...9 V Bumper 10 Heater Housing 11 Motor 115V 60Hz 12 Heater 120V 14 Handle 15 Top Warning Label 16 Control Board Fuse 200mA 17 Overtemp Switch 18 Electrical Shield 19 Control Panel Label 20 Back Plate...

Страница 24: ...Figure 10 Exploded Drawing Detail of Control Board J1 J2 Bair Hugger Model 505 Service Manual 21...

Страница 25: ...el In Warranty Repair and Exchange USA Replacement parts to correct a problem are delivered at no charge To return a device to Arizant Healthcare Inc for service first obtain a Return Authorization RA...

Страница 26: ...oam pad Leave the 2 lower foam pad in place in the bottom of the carton Rotate the hose elbow toward the back of the unit and 3 carefully lower the unit into the carton Place the hose as shown in Figu...

Страница 27: ...nections of the thermocouple J2 on the control board See Figure 10 Reattach any loose thermocouple leads connections The warming unit heats at some temperature settings but not on others Example the w...

Страница 28: ...Maintenance Log Date Maintenance Action Performed Hour Meter Bair Hugger Model 505 Service Manual 25...

Страница 29: ...Maintenance Log Date Maintenance Action Performed Hour Meter Bair Hugger Model 505 Service Manual 26...

Страница 30: ...Maintenance Log Date Maintenance Action Performed Hour Meter Bair Hugger Model 505 Service Manual 27...

Страница 31: ...used on isolation switch ON OFF push button switch Temperature Control Equipotentiality plug Ground Fuse Attention see appropriate documents Dangerous Voltage Type BF Equipment patient applied Voltage...

Отзывы: