INSTALLATION
SETUP/PHYSICAL INSTALLATION
2 - 6
I-E96-420A
®
4. Insert the module until it locks securely into place.
5. Connect the other end of the twisted pair to TB1 terminals
3 and 4 on the NIAM02 module for internal calibration or to the
external millivolt source for external calibration.
6. Replace the front cover.
The NIAC02 module is ready for operation if:
1. The circuit board is mounted in the termination mounting
unit.
2. All required cables are connected to the calibration module.
3. All required wires are connected to the calibration module.