INSTALLATION
SETUP/PHYSICAL INSTALLATION
3 - 2
I-E96-316A
®
SETUP/PHYSICAL INSTALLATION
Prior to installation, you must set the module dipswitches and
install jumpers to configure the I/O. You must configure the
Termination Unit (TU) or Termination Module (TM) to accept the
field device signals and output the QRS signals to the process.
Slave Address Selection Switch (S1)
The QRS can have one of 64 addresses (address 0 to 63) on the
slave expander bus. This address uniquely identifies the slave
to the Multi-Function Processor (MFP) and must be the same
as the address set in the MFP configuration (Function Code 79
specification 1).
The address is set by the eight position address dipswitch (S1)
shown in Figure
. The six right switch positions (3 through
8) of S1 set the six bit QRS address. Positions 1 and 2 are not
used and must remain in the closed position (see Figure
Table
is a binary address conversion table for setting S1.
Figure 3-1. Quick Response Slave Module
JUMPERS
ANALOG OUTPUT
MODE SWITCH
EDGE
CONNECTORS
ANALOG OUTPUT
DEFAULT SWITCH
P1
P3
P2
ADDRESS SWITCH
J7
S1
MODULE STATUS LED
1
8
OPEN
S2
1
6
OPEN
2
1
TP27103A
4
1
J6
4
1
J3
4
1
J5
4
1
J2
4
1
J4
4
1
J1
C1
C2
C3
C4
S3
Figure 3-2. Address Select Switch (S1)
1
2
3
4
5
8
6
7
OPEN
MUST
REMAIN
CLOSED
SLAVE
ADDRESS
MSB
LSB
TP65205A
NOTE: OPEN POSITION = LOGIC 1