MAINTENANCE
PREVENTIVE MAINTENANCE PROCEDURES
6 - 4
WBPEEUI240754A0
®
Checking Connections
NOTE: Power to the cabinet should be off while performing this pre-
ventive maintenance task.
Check all signal wiring, power and ground connections within
the cabinet to verify their integrity. When checking connec-
tions, always turn a screw, nut or other fastening device in the
direction to tighten only. If the connection is loose, it will be
tightened. If the connection is tight, the tightening action will
verify that it is secure. There must not be any motion done to
loosen the connection.
1. Verify that all power connections within the cabinet are
secure.
2. Verify that all wiring connections to the termination unit,
or termination module are secure.
WARNING
There are exposed AC and DC connections inside the cabinet.
These exposed electrical connections present a shock hazard
that can cause injury or death.
If input or output circuits are a shock hazard after disconnect-
ing system power at the power entry panel, then the door of the
cabinet containing these externally powered circuits must be
marked with a warning stating that multiple power sources
exist.