19
19
SETUP AND ADJUSTMENTS
Before Operating
1. Securely fasten this hydraulic press to a level concrete floor.
2. Make sure t
here is adequate lighting and a 40” (1,016mm) minimum
clearance around the entire machine.
3. Before using for the first time, pour a teaspoon of good quality air tool
lubricant into the air supply inlet of the lift control valve. Connect a 120
psi (.83Mpa) airline to the control valve and press the handle for 3
seconds to evenly distribute the lubricant.
4. To purge air from the manual system, open the release valve (35) by
turning it counterclockwise (ccw) a couple turns. Pump the manual
handle several full strokes to eliminate any air in the system. Turn the
release valve (35) clockwise (cw) to close.
5. To purge air from the compressed air system, open the release valve
(35) by turning it counterclockwise (ccw) a couple turns. Connect your
airline to the fitting on the lift control valve. Press the valve handle and
let the pump work several times to eliminate any air in the system.
Turn the release valve (35) clockwise (cw) to close.
Ram Slide Adjustment
To move the ram slide laterally:
1. Loosen the four spring loaded hex bolts.
2. Slide the assembly to a new location.
3. Re-snug the spring loaded hex bolts enough to secure the ram
slide.
35
Oil
46
Содержание HSP-30A
Страница 10: ...8 8 MACHINE SAFETY LABELS...
Страница 17: ...15 15 GETTING TO KNOW YOUR MACHINE 7 13 11 9 12 31 Hardware 5 10 6...
Страница 28: ...26 26 PARTS DIAGRAM FRAME...
Страница 30: ...28 28 Item Description Qty 34 Pump Assembly 1 35 Release Valve 1 36 Plug 1 37 Oil Hose 2...
Страница 31: ...29 29 PARTS DIAGRAM HYDRAULIC ASSEMBLY...
Страница 34: ...32 32 PARTS IDENTIFICATION MAIN CYLINDER...
Страница 36: ...34 34 HYDRAULIC SCHEMATIC Handle Air P...
Страница 38: ...36 36 NOTES...
Страница 39: ...37 37 NOTES...