14
14
•
ENSURE
that the machine sits firmly before using. If the machine wobbles or is unstable,
correct the problem by attaching to a bench top prior to operation.
•
LEVELING:
The machine should be sited on a level, concrete floor. Provisions for securing it
should be in position prior to placing the machine. The accuracy of any machine depends on
the precise placement of it to the mounting surface.
•
FLOOR:
This tool distributes a large amount of weight over a small area. Make certain that
the floor is capable of supporting the weight of the machine, work stock, and the operator.
The floor should also be a level surface. If the unit wobbles or rocks once in place, be sure to
eliminate by using shims.
•
WORKING CLEARANCES:
Take into consideration the size of the material to be
processed. Make sure that you allow enough space for you to operate the machine freely.
•
POWER SUPPLY PLACEMENT:
The power supply should be located close enough to the
machine so that the power cord is not in an area where it would cause a tripping hazard. Be
sure to observe all electrical codes if installing new circuits and/or outlets.
GETTING TO KNOW YOUR MACHINE
D
C
E
B
F
G
H
A
Содержание IP-1306
Страница 38: ...35 35 PLANER PARTS DIAGRAM A...
Страница 43: ...40 40 MOTOR PARTS DIAGRAM B...
Страница 47: ...44 44 NOTES...