12/22
Instruction manual
24V motor control device for flush box mounting - Version 1.1
w w w .b ai e r- g mb h .d e
6
Initial operation
6
Initial operation
When the control device is mounted and electrically connected, the inital operation
must be performed.
The following sections describe the parts of the control device, which are relevant
for the initial operation. The following chapters describe step by step, which
functions must be set up and how the initial operation is done.
Potentiometer,
to set the tolerance of
power operated
shutdown
Configuration switch
Status LEDs
-
+
Figure 3
Control device
configuration elements
top view
Reset key
Содержание PROMETHEUS Series
Страница 21: ......