![Baicells ATOM OD06 CPE Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/baicells/atom-od06-cpe/atom-od06-cpe_installation-and-configuration-manual_3446299014.webp)
14
a3) Attach the UE to the bracket, and tighten the screw (Figure 18).
Figure 19: Attach UE
a4) The UE is now ready for installation at its final outside location. Then, proceed to
section 7
Basic Configuration
.
10.
Wall installation:
a.
Low-Gain UE:
a1) Slip the bracket off of the Atom unit, and fit it on the wall to mark the drilling locations
(Figure 11), The marked locations, drill four 10-mm diameter and 70-mm depth holes.
Figure 20: Mark Holes for Drilling
a2) Check the up/down direction of the bracket, and then fix it on the wall using the M5 tapping
screws (Figure 12).
Figure 21: Fix Bracket to Wall
a3) Attach the UE to the bracket, and tighten the screw (Figure13).
Figure 22: Attach UE