![Baicells ATOM OD06 CPE Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/baicells/atom-od06-cpe/atom-od06-cpe_installation-and-configuration-manual_3446299012.webp)
12
2.
Insert the service provider's SIM/USIM card into the card slot (Figure 6).
Attention:
Never power on the unit while installing or uninstalling the USIM card. Doing so
could damage the card and the unit.
Figure 7: LTE Network Architecture
3.
Prepare the outdoor shielded CAT5E Ethernet cable. The Ethernet cable will run between the
outdoor UE and the inside of the facility, where it will connect to the PoE adaptor and LAN. Cable
length will vary by location.
4.
Connect one end of the Ethernet cable to the PoE port on the unit. Connect the other end to the
power adaptor (Figure 8).
Figure 9: PoE Adaptor
5.
Close the UE’s waterproof cover, and tighten the screws.
6.
Prepare the 16mm
2
yellow-green ground wire, and follow the steps below. Once the unit is fully
installed, make sure the grounding cable is connected to a solid grounding point (earth).
a.
Atom Low-Gain UE: Connect the ground cable to the ground screw (Figure 10).
Figure 11: Low gain CPE Grounding