background image

Nova-436 Outdoor LTE TDD Base Station Installation Guide 

 

 

About This Document 

This  document  is  a  guidance  of  Nova-436  hardware  installation  for  installation 

personnel,  including  the  preparation  of  installation  tools  and  supporting  materials, 

the demands for installation environment, installation  procedure, cable connection 

and power on. 

Accomplish  the  installation  of  the  device  according  to  this  guide,  the  installation 

personnel  can  avoid  potential  damage  to  the  device  during  the  installation 

procedure, which makes sure the subsequent good running of the device.   

This document is suitable for model mBS2130. 

 

Copyright Notice 

Baicells copyrights this specification. No part of this specification may be reproduced in 

any form or means, without the prior written consent of Baicells. 

 

Disclaimer 

This  specification  is  preliminary  and  is  subject  to  change  at  any  time  without  notice. 

Baicells assumes no responsibility for any errors contained herein. For more information, 

please consult our technical engineers. 

 

Disposal of Electronic and Electrical Waste 

Pursuant to the WEEE EU Directive, electronic and electrical waste must not 

be  disposed  of  with  unsorted  waste.  Please  contact  your  local  recycling 

authority for disposal of this product.

 

 

Revision Record 

Date 

Version 

Description 

30 Oct, 2017 

01 

Initial Released. 

16 Jan, 2018 

02 

Optimize descriptions and fix some bugs. 

 

Contact Us 

Baicells Technologies Co., Ltd.   

Address: 3F, Bldg A, No.1 Kai Tuo Rd., Haidian Dist., Beijing, PR China, 100085 

E-mail: [email protected]/[email protected] 

Tel: 400-612-0167 

Fax: +86-10-62607100 

Содержание Nova-436

Страница 1: ...02 All rights reserved Baicells Technologies Co Ltd Nova 436 Outdoor LTE TDD Base Station Installation Guide...

Страница 2: ...cification may be reproduced in any form or means without the prior written consent of Baicells Disclaimer This specification is preliminary and is subject to change at any time without notice Baicell...

Страница 3: ...aximum Output Power 6 2 Installation Preparation 8 Support Materials 8 2 1 Installation Tools 8 2 2 Installation Environment 9 2 3 2 3 1 Locational Requirements 9 2 3 2 Environmental Requirements 9 Pe...

Страница 4: ...f Figures Figure 1 1 Nova 436 Appearance 2 Figure 1 2 Nova 436 Interfaces and Indicators 2 Figure 3 1 Installation Procedure of Nova 436 12 Figure 3 2 Install GPS Antenna 13 Figure 3 3 Location of Gro...

Страница 5: ...Outdoor LTE TDD Base Station Installation Guide Table 2 1 Support Materials for Installing Base Station 8 Table 2 2 Environmental Requirements of the Base Station 9 Table 4 1 Nova 436 Indicator Descri...

Страница 6: ...so on Features 1 2 Adopt the integration design of baseband and RF Citizens Broadband Radio Service CBRS band covers with dual carrier Based on 3GPP international standard TDD LTE technology provide...

Страница 7: ...Installation Guide 2 Appearance 1 3 The Nova 436 base station appearance is shown in Figure 1 1 Figure 1 1 Nova 436 Appearance The Nova 436 interfaces and indicators are shown in Figure 1 2 Figure 1...

Страница 8: ...45 interface used for debug or data backhaul The Nova 436 interface indicators are described in Table 1 2 Table 1 2 Nova 436 Interface Indicators Identity Color Status Description PWR Green Steady On...

Страница 9: ...Mbps per cell SA2 DL 110 Mbps UL 14 Mbps per cell 2 10MHz SA1 DL 40 Mbps UL 14 Mbps per cell SA2 DL 55 Mbps UL 7 Mbps per cell User Capacity 96 concurrent users per cell carrier 192 concurrent users...

Страница 10: ...ment Specification Item Description Operating Temperature 40 C to 55 C Storage Temperature 45 C to 70 C Humidity 5 to 95 Atmospheric Pressure 70 kPa to 106 kPa Ingress Protection Rating IP66 Power Int...

Страница 11: ...o Ltd TQJ 3500AC6 6 External Omnidirectional Antenna Single Pole Kenbotong Technology Co Ltd TQJ 3500AC3 3 External Omnidirectional Antenna Single Pole Kenbotong Technology Co Ltd TQJ 3500AT8 8 1 4 5...

Страница 12: ...Nova 436 Outdoor LTE TDD Base Station Installation Guide 7 8 10 28 39 20 28 39...

Страница 13: ...er than 100m 330 feet Antenna RF cable 50 ohm feeder Optical fiber Single mode optical fiber Ethernet cable Outdoor CAT6 Shorter than 100m 330 feet Antenna Omnidirectional or directional antenna Groun...

Страница 14: ...t the communication engineering environmental requirements as well as the technical requirements of network planning and communication equipment 2 3 2 Environmental Requirements Table 2 2 gives the ba...

Страница 15: ...aint anti oxidation coatings grease and so on Weatherproof Protection 2 6 The Nova 436 adopts cold shrink tube for weatherproof protection Before installing the cold shrink tube clean up the interface...

Страница 16: ...equipment should be installed and operated with minimum distance 30 cm between the radiator your body ISEDC Compliance This device complies with Innovation Science and Economic Development Canada lic...

Страница 17: ...consistent with the packing list Installation Procedure 3 2 The installation procedure of Nova 436 is given in Figure 3 1 Figure 3 1 Installation Procedure of Nova 436 Install GPS Antenna 3 3 Installa...

Страница 18: ...Figure 3 2 Install GPS Antenna Install on Pole 3 4 Required diameter of the pole 40mm 100mm Suggest the installation height higher than 120cm The base station bracket has been assembled before packin...

Страница 19: ...ation bracket must be upward 3 Hung the two pin on the base station bracket to the installation bracket push the base station until the hook block to the base station s bracket 4 Tighten screws on the...

Страница 20: ...direction of the installation rack and then fix base station to the wall using M8 80 expansion screws 5 Refer to the installation steps on pole fix base station on wall Connect Cable 3 6 3 6 1 Require...

Страница 21: ...er into cold shrink tube 2 Connect one end of the GPS jumper to the GPS antenna 3 Push the cold shrink tube to the top joint and pull out the strip 4 Connect the other end of the GPS jumper to GPS int...

Страница 22: ...stallation site and assemble power plug and power terminal on two ends of power adapter Strip 12mm insulating layer with wire stripper which is used for connection to connector It is recommended that...

Страница 23: ...the bottom of the base station as shown in Figure 3 3 Figure 3 3 Location of Grounding Screws 1 Unscrew one grounding screw connect one end of the grounding cable to the grounding screw and fasten it...

Страница 24: ...own in Figure 3 4 In principle no lightening rod can be welded to pole no metal object is allowed within 1m of the horizontal direction of the omnidirectional antennas when installing the omnidirectio...

Страница 25: ...irectional Antennas 1 First assemble the antennas as shown in Figure 3 6 Figure 3 6 Assembling Procedure of Directional Antennas 2 To install it on the iron tower use a pulley to transport the antenna...

Страница 26: ...asten it with steel wires Then mount the directional outdoor antenna onto the pole using the installation rack as shown in Figure 3 8 Figure 3 8 Directional Antenna Installation 4 When the base statio...

Страница 27: ...is given in Table 4 1 Table 4 1 Nova 436 Indicator Description Identity Color Status Description PWR Green Steady On Power On OFF No Power Supply CELL2 Green Fast flash 0 125s on 0 125s off CELL 2 ina...

Отзывы: