Commissioning/Decommissioning
26 EN
04/2019
6 Commissioning/Decommissioning
6.1 Commissioning
NOTICE
The pump/unit can be damaged if it runs dry!
Ensure that the pump/unit is always full of water. This also
applies to checking the rotation direction.
6.1.1 Pre-requisites for commissioning
• Electrical
connection is available.
•
Pump/unit is filled with pumped fluid.
•
Lockwasher has been removed from the shaft groove. The
hexagon screws are tightened.
•
Pump/unit is ready for operation.
•
Shaft can be turned by hand.
6.1.2 Filling pump/unit with pumped fluid and ventilating
NOTICE
Shut-off valves may not be closed during the filling
procedure.
1. Ventilate the pump and suction line and fill with the pumping
liquid.
The Normblock Multi is self-ventilating. No handles
necessary.
BADU Block Multi: a ball valve Rp 3/8 (701) is attached in
order to be able to fully ventilate the mechanical seal
chamber. The mechanical seal chamber must be
ventilated using the ball valve before commissioning and
everytime after cleaning the strainer basket.
Please observe the sticker on the vent tap.
2. Completely
open
the shut-off valves in the suction line.
3. Completely open any additional connections.
NOTICE
After filling the pump, it is possible that small amounts of air may
remain in the pump/unit. These will automatically be filled with the
pumping liquid after the motor has been turned on.
Содержание Normblock Multi 100/250
Страница 3: ...DE DE Originalbetriebsanleitung Normblock Multi Block Multi VW61 21 030...
Страница 21: ...Transport und Zwischenlagerung 04 2019 DE 19 VW61 21 027 Abb 3 VW61 21 029 Abb 4...
Страница 51: ...Technische Daten 04 2019 DE 49 BADU Block Multi Abb 12...
Страница 55: ...Technische Daten 04 2019 DE 53 10 2 Kennfeld Abb 13...
Страница 56: ...Technische Daten 54 DE 04 2019 Abb 14...
Страница 57: ...Technische Daten 04 2019 DE 55 10 3 Explosionszeichnung Abb 15 Abb 16...
Страница 60: ......
Страница 61: ...EN EN Translation of original operation manual Normblock Multi Block Multi Normblock Multi VW61 21 030...
Страница 78: ...Transport and intermediate storage 18 EN 04 2019 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Страница 108: ...Technical data 48 EN 04 2019 BADU Block Multi Fig 12...
Страница 112: ...Technical data 52 EN 04 2019 10 2 Characteristics Fig 13...
Страница 113: ...Technical data 04 2019 EN 53 Fig 14...
Страница 114: ...Technical data 54 EN 04 2019 10 3 Exploded drawing Fig 15 Fig 16...
Страница 117: ...FR FR Traduction des instructions d utilisation originale Normblock Multi Block Multi VW61 21 030...
Страница 136: ...Transport et stockage interm diaire 20 FR 04 2019 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Страница 167: ...Donn es techniques 04 2019 FR 51 BADU Block Multi Fig 12...
Страница 171: ...Donn es techniques 04 2019 FR 55 10 2 Courbe de d bits caract ristique Fig 13...
Страница 172: ...Donn es techniques 56 FR 04 2019 Fig 14...
Страница 173: ...Donn es techniques 04 2019 FR 57 10 3 Vue clat e Fig 15 Fig 16...
Страница 176: ......
Страница 177: ...NL NL Vertaling van de oorspronkelijke gebruikershandleiding Normblock Multi Block Multi VW61 21 030...
Страница 195: ...Transport en tijdelijke opslag 04 2019 NL 19 VW61 21 027 Afb 3 VW61 21 029 Afb 4...
Страница 225: ...Technische gegevens 04 2019 NL 49 BADU Block Multi Afb 12...
Страница 229: ...Technische gegevens 04 2019 NL 53 10 2 Grafieken Afb 13...
Страница 230: ...Technische gegevens 54 NL 04 2019 Afb 14...
Страница 231: ...Technische gegevens 04 2019 NL 55 10 3 Explosietekening Afb 15 Afb 16...
Страница 234: ......
Страница 235: ...IT IT Traduzione del manuale d istruzioni originali Normblock Multi Block Multi VW61 21 030...
Страница 253: ...Trasporto ed immagazzinamento temporaneo 04 2019 IT 19 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Страница 283: ...Dati tecnici 04 2019 IT 49 BADU Block Multi Fig 12...
Страница 287: ...Dati tecnici 04 2019 IT 53 10 2 Curva caratteristica Fig 13...
Страница 288: ...Dati tecnici 54 IT 04 2019 Fig 14...
Страница 289: ...Dati tecnici 04 2019 IT 55 10 3 Disegno esploso Fig 15 Fig 16...
Страница 292: ......
Страница 293: ...ES ES Traducci n de las instrucciones originales para el manejo Normblock Multi Block Multi VW61 21 030...
Страница 311: ...Transporte y almacenamiento intermedio 04 2019 ES 19 VW61 21 027 Fig 3 VW61 21 029 Fig 4...
Страница 341: ...Datos t cnicos 04 2019 ES 49 BADU Block Multi Fig 12...
Страница 345: ...Datos t cnicos 04 2019 ES 53 10 2 Curva de rendimiento Fig 13...
Страница 346: ...Datos t cnicos 54 ES 04 2019 Fig 14...
Страница 347: ...Datos t cnicos 04 2019 ES 55 10 3 Dibujo de despiece Fig 15 Fig 16...
Страница 350: ......