Rotate meter by hand to view flow scale
Never
use wrench to rotate meter
body when viewing flow scale
Figure 5: Rotating the test kit
OPERATION
See
“Application Information” on page 14
Test Kit Information
ALWAYS START WITH THE LOADING VALVE OPEN.
ALL TEST KITS ARE SHIPPED WITH THE LOADING VALVE IN THE CLOSED POSITION. THE LOADING VALVE MUST BE
OPENED FULLY BEFORE INITIATING FLOW AND TESTING OF THE HYDRAULIC CIRCUIT. TURN THE LOADING VALVE
HANDLE COUNTERCLOCKWISE TO THE FULLY OPEN POSITION. FAILURE TO OPEN THE LOADING VALVE FULLY CAN
RESULT IN INJURY TO PERSONNEL AND/OR DAMAGE TO THE EQUIPMENT.
Operation
Page 9
September 2014
VAM-UM-00551-EN-03
www.
.com
1.800.561.8187