![Badger Meter Hedland PE Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/badger-meter/hedland-pe/hedland-pe_user-manual_3560185008.webp)
3 . After installation, rotate the meter by hand to view the flow scale .
Rotate meter by hand to view flow scale
Never
use wrench to rotate meter
body when viewing flow scale
Figure 3: Rotating the meter
Installing the Test Kit Flow Meter
1 . Mount the VA High Pressure Test Kit Flow Meter so fluid is traveling in the direction of the flow arrow . See
.
2 . Install the test kit at any location in the hydraulic circuit that is suitable for viewing . To connect the test kit into the piping
system, place an open-ended wrench onto the test kit valve on the inlet side or on the test kit wrench flat on the outlet
side adjacent to the pipe connection being installed .
DO NOT
wrench on the opposite end of the test kit or leakage may
result . See
Place wrench on valve body
on the same side
plumbing is being tightened
Never
place wrench on valve body opposite
plumbing being tightened
Figure 4: Installing the test kit
3 . Or, use quick disconnect couplings for easy connections and to keep the test kit sealed and clean when not in use . For
diagrams illustrating typical test placements for the test kits, see
"Test Procedures for Test Kit Flow Meters" on page 10
4 . After installation, rotate the meter by hand to view the flow scale .
Installation
Page 8
September 2014
VAM-UM-00551-EN-03
www.
.com
1.800.561.8187