2-4 Continued...
Loosen (4) 5/16”-18 x 3/4” HHCS P#(K1153) that secure
the gearbox to the PTO assembly. Loosen the belt
tension adjustment bolt: (1) 3/8”-16 x 2” HHCS
P#(K1208). Refer to Figure 2-4b and 2-4c for reference.
After loosening the hardware in Figure 2-4b and 2-4c,
slide the gearbox to the farthest left position (towards the
engine). Wrap one end of the kevlar belt P#(M0247)
around the engine pulley. Refer to Figure 2-4d. Next,
wrap the other end of the kevlar belt around the pulley
on the gearbox. Refer to Figure 2-4e.
2-4 Continued...
With the kevlar belt wrapped around both pulleys, tilt the
PTO assembly toward the engine, aligning the PTO
mount pin holes on the PTO assembly with the mounting
holes on the right frame mount assembly. Insert the PTO
mount pin P#(B0274) in the mounting holes and fasten
with (1) 1/8” x 2-3/8” hair pin clip P#(K0086). Refer to
Figure 2-4f for reference.
9
7
Figure 2-4b
Figure 2-4c
Loosen
(2) 5/16”-18 x 3/4” HHCS
Loosen (1) 3/8”-16 x 2” HHCS
Figure 2-4d
Figure 2-4e
Engine Pulley
Wrap Belt Here
Gearbox Pulley
Figure 2-4f
Loosen
(2) 5/16”-18 x 3/4” HHCS
Belt Tension
Adjustment
Bolt
Tilt PTO
Fasten With (1) Hair Pin Clip
Insert PTO Mount Pin
Содержание Q0378
Страница 20: ...20...
Страница 21: ...21 NOTES...
Страница 22: ...Bad Boy Mowers Phone 866 622 3269 Website www badboymowers com...