13
2” (5,1 cm)
2” (5,1 cm)
1/8" (0,3 cm)
Pre-drill
1/8" (0,3 cm)
Pre-drill
1” (2,5 cm)
1” (2,5 cm)
CORBELS
PARTS REQUIRED:
Position corbels
D
on
fl
at surface and pre-drill 1/8" (0,3 cm) holes
through as shown.
Square post and rafter.
3
2
Position corbels
fl
ush to top edge of outer main rafter
K
and post
H.
1
BEGIN
1/8" (0,3 cm)
Drill Bit
D
x4
3-3/8 x 3-3/8 x 37" (8,6 x 8,6 x 94 cm)
D x4
J
H
G
Flush
Flush
Flush
Содержание Heartland CATALINA
Страница 2: ...This page intentionally left blank...