3
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
DRIP EDGE ..................... 40 Feet
#15 ROOFING FELT
To cover 169 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 6 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 3 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 4 Lbs
For shingles.
PAINT FOR TRIM .............................2 Quart
Use 100% acrylic latex exterior paint.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
The included floor has been designed for general use. Depending on
your specific use you may want to construct a heavy duty floor frame
by adding additional floor joists (shown below as shaded). Below is a
list of additional materials (not included):
x6
x24
2 x 4 x 8' (5 x 10 x 244 cm) Treated Lumber
Cut to (6) 2 x 4 x 93" (5 x 10 x 236 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
• This shed kit includes a complete wood floor system.
• This shed kit does not include ANY leveling materials.
•
See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level your
floor, as this will vary depending on your specific site.
Optional 12" (30,5 cm) spacing
Standard 24" (61 cm) spacing
Содержание HEARTLAND 16985
Страница 2: ...This page intentionally left blank...