32
6"
(15 cm)
64"
(163 cm)
Flush
PT
Flush
3"
(7,6 cm)
Screws
Use one (1)
PT
across door opening
to maintain 64" dimens
FRONT WALL
PARTS REQUIRED:
x2
x1
x49
x2
2" (5 cm)
3" (7,6 cm)
FINISH
Your front wall panels are now installed.
Use
PT
as a brace to maintain 64" opening.
Secure using (2) 3" screws to attach.
Continue installing panels primed side up fl ush under
overhang
(Fig. A).
Note 1/4" offset on right panel.
Secure panels using 2" nails 6" apart on edges and 12"
apart inside panel.
4
7
6
5
2 x 3 x 96" (5 x 7,6 x 244 cm)
PT
3/8 x 15-7/8 x 72" (1 x 40 x 183 cm)
There will be
an overhang
at top
and bottom
Flush panels
under
overhang
Fig. A
1/4"
(6 mm)
10 to12"
LIP EDGE
SQUARE
EDGE
1/4"
(6 mm)
Do not nail
in groove.
Primed
side up
PT
Содержание HEARTLAND 16985
Страница 2: ...This page intentionally left blank...