90°
90°
BOTH ENDS OF HEADER.
BEYOND THE POST ON EACH END. INSTALL FIRST 4" TIMBERLOCK SCREWS AND CAP NUTS TO TOP OF POST ON
STEP 5: FRONT HEADER
5.1 - PLACE THE 2 X 8 HEADER ASSEMBLY TO THE FRONT POSTS. THE HEADER IS PRE-MARKED AT 12" TO EXTEND
5.2 - CHECK POST TO HEADER CONNECTION WITH A SQUARE. INSTALL SECOND TIMBERLOCK SCREWS AND
CAP NUTS TO EACH END AS SHOWN BELOW.
HEADER ASSEMBLY
LEVEL
FIRST
TOP OF HEADER ARE MARKED FOR 12" OVERHANG AT SIDES
(ONE PER SIDE)
WITH CAP NUT
FRONT POST
FRONT POST
4" TIMBERLOCK
IF OPPOSITE POST IS TALLER, POST WILL NEED TO BE TRIMMED.
(93" TALL)
(93" TALL)
HEADER ASSEMBLY MUST BE FLUSH TO AT LEAST ONE POST TOP END.
HEADER ASSEMBLY MUST BE LEVEL.
12"
12"
120"
BETWEEN POSTS
OF POST AT HEADER
SECOND
4" TIMBERLOCK SCREW
(ONE PER SIDE)
WITH CAP NUT
OPPOSITE CORNERS
NOTE:
STAGGER SCREWS
DIAGONALLY IN
4"
4"
11